Best Production Scheduling Software for Foundries and Metal Forming 2026

✓ Verified 16 Oct 202611 products6 published criteriaNext check Jan 2027
Short answer. As of October 2026, SkyPlanner APS ranks #1 for foundries and metal forming with 97 of 100, because dies, patterns and molds are scheduled as tools that cannot be on two machines at once and jobs are grouped by alloy and die. DELMIA Ortems ranks #2 with 75, because it plans finite capacity across machine, material and labor limits and reduces buffer inventory across multi-level bills of materials.

This list is for

  • Sand, die and investment casting foundries
  • Open and closed die forges
  • Stamping, pressing and extrusion plants, with or without in-house heat treatment
  • Metal forming groups of any size, from one plant to several sites

This list is not for

#1 FOUNDRIES AND METAL FORMING
1RANK
SkyPlanner APS APSPublic pricing
★★★★★4.9/ 5 on this list
Manufacturers of any size that want finite capacity scheduling with automatic rescheduling on top of their ERP
PriceFrom €199/mo 5 workstations included, then €20/mo per extra workstation
Free trial30 days trial, no card
Finite capacityYes
Finite capacity scheduling depth5.0Mold and tool availability constraints5.0Sequence-dependent setup optimization5.0Multi-stage flow with WIP buffers4.0Automatic rescheduling5.0ERP integration path5.0

Ranked here because: SkyPlanner APS ranks #1 with 97 and scores 5 of 5 on five of the six foundry criteria. Dies, patterns and molds are scheduled tools linked to the products and machines that can use them, so one die is never planned on two presses at the same time and a die in repair blocks every job that needs it. A changeover matrix per machine and the "Similar jobs in succession" priority group jobs by alloy and die, which keeps a press on its die as long as due dates allow. Melting, pouring or pressing, cooling, heat treatment, fettling, machining and coating sit in one routing, and teardown times hold a casting while it cools or ages without blocking the machine (4 of 5). When a furnace or press stops, Autopilot rebuilds the plan with the Arcturus engine. It connects to any ERP or MES through its two-way REST API, with webhooks and CSV import. As of October 2026 the price starts from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card for up to 20 workstations. Pick it if you cast, forge, stamp or extrude to customer orders, at any size, and want die conflicts and alloy changes solved by the scheduler instead of the planner.

Not a fit if: You need a free-forever plan; SkyPlanner APS offers a 30-day trial without a card instead.

2RANK
DELMIA Ortems APSQuote only
★★★★☆3.8/ 5
Process and batch manufacturers that need finite capacity across machines, materials and labor
PriceQuote no public price
Free trialNone no trial stated
Finite capacityYes
Finite capacity scheduling depth5.0Mold and tool availability constraints3.0Sequence-dependent setup optimization3.0Multi-stage flow with WIP buffers4.0Automatic rescheduling4.0ERP integration path3.0

Ranked here because: DELMIA Ortems ranks #2 with 75, level with Siemens Opcenter APS and ahead on the alphabetical tie rule. It scores 5 of 5 on finite capacity across machine, material and labor limits, 4 of 5 on rescheduling for fast replanning after disruptions, and 4 of 5 on multi-stage flow because it reduces WIP and buffer inventory through multi-level bill of materials synchronization. It manages constraints across machines, tools and operators (3 of 5 on dies and molds). An SAP adapter and a Sage X3 connector are documented. Pick it if your castings or forgings feed multi-level assemblies and you plan on SAP or Sage X3.

Not a fit if: Alloy and die changeovers drive your schedule; Ortems states that it reduces changeover and set-up times but describes no sequence-dependent model (3 of 5), and Dassault Systemes publishes no price as of October 2026.

3RANK
Siemens Opcenter APS APSQuote only
★★★★☆3.8/ 5
Enterprise manufacturers that need real-time rescheduling across several plants
PriceQuote no public price
Free trial30 days
Finite capacityYes
Finite capacity scheduling depth4.0Mold and tool availability constraints3.0Sequence-dependent setup optimization5.0Multi-stage flow with WIP buffers3.0Automatic rescheduling4.0ERP integration path3.0

Ranked here because: Siemens Opcenter APS ranks #3 with 75 and scores 5 of 5 on setups, because it applies sequence-dependent changeover times based on an operation's attributes and optimizes toward fewer changeovers. That fits alloy, die and press-tonnage sequences on a forge or die casting line. It schedules in finite or infinite capacity mode, adjusts the schedule dynamically in real time (4 of 5 on both) and models auxiliary constraints such as tooling and materials (3 of 5). Pick it if you run a large foundry or forge with a planning team that wants changeovers calculated from job attributes.

Not a fit if: You want a public price or a named ERP connector; as of October 2026 Siemens states only a generic ERP and MES connection on its APS pages and publishes no price.

4RANK
Asprova APSQuote only
★★★☆☆3.4/ 5
Enterprise multi-plant manufacturers that need finite capacity scheduling with documented ERP interfaces
PriceQuote no public price
Free trialFree trial download after free Asprova ID registration; length not stated
Finite capacityYes
Finite capacity scheduling depth4.0Mold and tool availability constraints4.0Sequence-dependent setup optimization3.0Multi-stage flow with WIP buffers4.0Automatic rescheduling1.0ERP integration path3.0

Ranked here because: Asprova ranks #4 with 68 and scores 4 of 5 on molds, the highest after SkyPlanner APS: its molding case schedules by the number of molds and cavities and blocks molds during maintenance. Time constraints between processes give it 4 of 5 on multi-stage flow, useful when a casting must reach heat treatment within a set window. It states finite capacity scheduling and lists SAP, QAD, JD Edwards and Dynamics AX interfaces. Pick it if you run high-volume die casting or forging lines and a planner will trigger every replan.

Not a fit if: You need the plan to update itself; Asprova documents reschedule as a manual command (1 of 5), and its package price is an "open price" as of October 2026.

5RANK
ROB-EX Scheduler APSQuote only
★★★☆☆3.3/ 5
Small manufacturers that want constraint-based scheduling with what-if scenarios
PriceQuote no public price
Free trialNone demo only
Finite capacityYes
Finite capacity scheduling depth4.0Mold and tool availability constraints3.0Sequence-dependent setup optimization3.0Multi-stage flow with WIP buffers4.0Automatic rescheduling3.0ERP integration path2.0

Ranked here because: ROB-EX (Proficy Scheduler) ranks #5 with 66. It schedules against capacity constraints and resource calendars (4 of 5), automatically considers equipment, tooling and resource availability (3 of 5), and models intermediate stock with minimum and maximum levels and transfer times between stages (4 of 5 on multi-stage flow). It states real-time rescheduling. Pick it if your melt shop behaves like a batch process with metal held between furnace, ladle and casting stations.

Not a fit if: Alloy and die sequencing is your main constraint (it states that it minimizes changeover times but describes no sequence-dependent model), or you need a named ERP or a public price, neither published as of October 2026.

6RANK
PlanetTogether APSQuote only
★★★☆☆3.3/ 5
Manufacturers that buy through a sales-led demo and need named integrations with SAP, NetSuite or Kinaxis Maestro
PriceQuote no public price
Free trialNone demo only
Finite capacityNot stated
Finite capacity scheduling depth3.0Mold and tool availability constraints3.0Sequence-dependent setup optimization4.0Multi-stage flow with WIP buffers4.0Automatic rescheduling1.0ERP integration path4.0

Ranked here because: PlanetTogether ranks #6 with 65. It sequences jobs with similar setups back-to-back using setup codes (4 of 5), maintains buffers at key points in multi-stage processes (4 of 5), and checks work against machine capacity, labor, materials and tooling (3 of 5 on dies and molds). It names integrations with SAP, NetSuite, Kinaxis Maestro, AVEVA and Aptean Ross. Pick it if you run one of those systems and a planner will drive every replan.

Not a fit if: A furnace breakdown should replan the shop without a planner; PlanetTogether states only "alerts and rescheduling tools" for planners (1 of 5), and it publishes no price as of October 2026.

7RANK
★★★☆☆3.0/ 5
Discrete, hybrid and regulated manufacturers that want MES, quality management and finite scheduling on one cloud platform
PriceQuote no public price
Free trialNone demo only
Finite capacityNot stated
Finite capacity scheduling depth4.0Mold and tool availability constraints3.0Sequence-dependent setup optimization3.0Multi-stage flow with WIP buffers2.0Automatic rescheduling2.0ERP integration path3.0

Ranked here because: Plex Smart Manufacturing Platform ranks #7 with 60. Its Finite Scheduler plans around work center capacity, employee skills, tools and floor space (4 of 5), sequences operations by attributes (3 of 5), and each die can carry its own preventive maintenance schedule (3 of 5 on dies and molds). Metal stampers such as Hatch Stamping and HK Metalcraft are quoted on its scheduling page. One cloud platform runs ERP, MES and quality. Pick it if you stamp or die cast for automotive OEMs and want ERP, MES and scheduling from one vendor.

Not a fit if: You want the schedule to replan itself or need modelled stock between operations; Rockwell describes schedule changes from plant-floor events and a user-defined MRP refresh (2 of 5), and no price is published as of October 2026.

8RANK
just plan it APSQuote only
★★★☆☆2.5/ 5
Job shops with multi-operation, high-mix, low-volume work
PriceQuote no public price
Free trialTrial not stated
Finite capacityYes
Finite capacity scheduling depth4.0Mold and tool availability constraints1.0Sequence-dependent setup optimization0.0Multi-stage flow with WIP buffers3.0Automatic rescheduling4.0ERP integration path4.0

Ranked here because: just plan it ranks #8 with 49. It states automatic finite scheduling (4 of 5) with real-time reprioritisation from shop-floor updates (4 of 5), and overlap through send-ahead quantities (3 of 5 on multi-stage flow). It connects to SQL-based ERPs through an API and names Microsoft, SAP and Sage. Pick it if you run a jobbing forge or machining-heavy foundry where due-date priority matters more than die changes.

Not a fit if: You need die or mold constraints or sequence-dependent setups; the vendor publishes no setup sequencing (0 of 5) and names no tools or molds as constraints (1 of 5).

9RANK
Odoo Manufacturing Open sourcePublic pricing
★★☆☆☆2.4/ 5
Small manufacturers that want finite capacity planning inside the Odoo ERP
Price€19.90/user/mo per user
Free trialFree tier One App Free: one app,…
Finite capacityYes
Finite capacity scheduling depth3.0Mold and tool availability constraints1.0Sequence-dependent setup optimization2.0Multi-stage flow with WIP buffers3.0Automatic rescheduling3.0ERP integration path3.0

Ranked here because: Odoo Manufacturing ranks #9 with 48. It states finite capacity planning with a Gantt chart, and linked work orders can be rescheduled automatically with the default "Auto-Reschedule (Keep Buffer)" setting (3 of 5 on rescheduling and multi-stage flow). As of October 2026 the Standard plan is listed at 19.90 euros per user per month billed yearly, a discounted rate Odoo applies for the first 12 months. Pick it if a small foundry wants ERP, inventory and manufacturing orders in one low-cost system.

Not a fit if: Dies or alloy sequences decide your schedule; Odoo uses a fixed setup and cleanup time per work center (2 of 5) and does not model tool or mold constraints (1 of 5).

10RANK
Monitor ERP MRP-ERPPublic pricing
★★☆☆☆2.3/ 5
Small and growing manufacturers that want ERP and planning in one cloud system
Price€93/user/mo per user
Free trialNone no trial stated
Finite capacityNot stated
Finite capacity scheduling depth2.0Mold and tool availability constraints3.0Sequence-dependent setup optimization2.0Multi-stage flow with WIP buffers3.0Automatic rescheduling1.0ERP integration path2.0

Ranked here because: Monitor ERP ranks #10 with 45. Its planning takes machine capacity, material and tools into account and it tracks tool maintenance (3 of 5 on dies and molds), and an overlap percentage per operation lets the next operation start early (3 of 5 on multi-stage flow). As of October 2026 it publishes a price from 93 euros per user per month as a complete cloud ERP. Pick it if you want a complete cloud ERP with a metal industry offering and planning inside it.

Not a fit if: You want a scheduler for an ERP you already run; Monitor ERP is the ERP itself, finite capacity is not stated (2 of 5), and its replan function has no stated automatic trigger (1 of 5).

11RANK
MRPeasy MRP-ERPPublic pricing
★★☆☆☆2.0/ 5
Small manufacturers that want MRP, inventory and accounting connections in one cloud tool
Price$49/user/mo per user
Free trial15+15 days trial, no card
Finite capacityYes
Finite capacity scheduling depth3.0Mold and tool availability constraints0.0Sequence-dependent setup optimization2.0Multi-stage flow with WIP buffers3.0Automatic rescheduling2.0ERP integration path2.0

Ranked here because: MRPeasy ranks #11 with 40. Its pricing page lists finite capacity operations scheduling (MRP II) and overlapping and converging production operations (3 of 5 on both). As of October 2026 it publishes prices from $49 to $149 per user per month. Pick it if a small casting or forming shop needs MRP, stock and purchasing first and scheduling second.

Not a fit if: Dies and changeover sequences are your constraint; MRPeasy publishes no tool or mold model (0 of 5) and applies one fixed setup time per routing operation (2 of 5).

All 11 products compared

#ProductCategoryEntry priceFree trialFinite capacityAuto rescheduleERP pathScore
1SkyPlanner APSAPSFrom €199/mo30 days, no cardYesAutopilotREST API (both directions), webhooks, CSV import; connects to any ERP or MES; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens97
2DELMIA OrtemsAPSQuoteNoneYesfast rescheduling after disruptions; trigger not describedGeneric ERP connectors; SAP adapter, Sage X3 connector75
3Siemens Opcenter APSAPSQuote30 daysYesDynamic schedule adjustment in real timeERP, MES (generic)75
4AsprovaAPSQuoteFree trial download after free Asprova ID registration; length not statedYesnot describedSAP, QAD, JD Edwards, Dynamics AX68
5ROB-EX SchedulerAPSQuoteNoneYesReal-time rescheduling and what-if scenarios; trigger not describedERP and MES connectors (generic)66
6PlanetTogetherAPSQuoteNoneNot statednot stated (alerts and rescheduling tools)SAP, NetSuite, Kinaxis Maestro, AVEVA, Aptean Ross ERP; also John Galt, Shiftboard65
7Plex Smart Manufacturing PlatformMESQuoteNoneNot statedVendor blog describes schedule changes from plant-floor events; not stated on the product pagePlex MES and QMS on one platform; Finite Scheduler described as an ERP/MRP agnostic API application60
8just plan itAPSQuoteTrial not statedYesAutomatic rescheduling with real-time reprioritization from shop-floor updatesMicrosoft, SAP, Sage; API for SQL-based ERPs; Excel49
9Odoo ManufacturingOpen source€19.90/user/moFree tierYesDependent work orders reschedule when a planner moves one in the GanttNative ERP; external API on the Custom plan only48
10Monitor ERPMRP-ERP€93/user/moNoneNot statednot documentedNative ERP; nesting, PDM, CAD, EDI45
11MRPeasyMRP-ERP$49/user/mo15+15 days, no cardYespartial (quantity change on unstarted order replans)Native ERP; QuickBooks Online, Xero, Salesforce, HubSpot, Shopify, WooCommerce, Zapier, EDI; API and webhooks on paid plans40

How this ranking works

Six criteria, fixed before scoring and versioned on the methodology page. Each product gets 0 to 5 per criterion from vendor pages, documentation and trial accounts. When a vendor changes its pricing or features, the list changes and the change log records it.

Full methodology ›
Finite capacity scheduling depth · 25
Mold and tool availability constraints · 20
Sequence-dependent setup optimization · 20
Multi-stage flow with WIP buffers · 15
Automatic rescheduling · 10
ERP integration path · 10

As of October 2026, the best production scheduling software for foundries and metal forming is SkyPlanner APS, with a weighted total of 97 out of 100. It leads because dies, patterns and molds are scheduled as tools that can never be on two machines at once, and because jobs are grouped by alloy and die so a press stays on its die as long as due dates allow. Melting, pouring or pressing, cooling, heat treatment, fettling and machining run in one routing, and teardown times hold a casting while it cools without blocking the line. When a furnace or press stops, Autopilot rebuilds the plan with the Arcturus engine. It connects to any ERP or MES through its two-way REST API, with webhooks and CSV import, and the price is public: from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card for up to 20 workstations. DELMIA Ortems, ranked #2 with 75, is the better choice for a plant whose castings or forgings feed multi-level assemblies on SAP or Sage X3. Siemens Opcenter APS, also at 75 and ranked #3, suits a large forge or die casting plant with a planning team that wants changeovers calculated from job attributes. SkyPlanner APS also ranks first on our enterprise multi-plant list, with 81. Prices and trials on this foundry list were last verified on 16 October 2026.

Who this list is for

This list is for plants that turn metal into shapes: sand, die and investment casting foundries, open and closed die forges, stamping and pressing plants, and extruders, including those that run heat treatment in-house or send it out. The scheduling question in these plants is which die goes on which press next, which alloy the furnace melts next, and whether the casting will be through heat treatment in time for machining.

A typical week looks like this. Several orders need the same die, and that die is due back from repair on Wednesday. The melt shop wants long runs of one alloy, while sales wants a short run of another alloy shipped Friday. Castings sit through cooling and shakeout before fettling, and heat treatment loads parts from several orders together. Then a furnace goes down for relining or a press loses its die setter, and every job after it moves. Most foundries answer this with a whiteboard, a spreadsheet and the planner’s memory. The software on this list replaces that with a schedule that knows the dies, the alloys and the waits.

  • Size: any size, from a single jobbing foundry to forging groups with several plants.
  • Production type: discrete castings, forgings, stampings and extrusions to customer orders and call-offs, often with machining and coating after forming.
  • ERP: with or without one; a scheduler that takes orders from your ERP, or an ERP with planning built in.
  • Budget: from a public monthly subscription to enterprise systems sold by quote.

This list is not for: sheet metal job shops that cut, bend and weld (see the metal fabrication list), CNC machine shops (see the machine shops list), plants whose main problem is OEM releases and EDI (see the automotive suppliers list), or buyers who need a free plan (see the free and open-source list).

How we ranked production scheduling software for foundries and metal forming

Six criteria are weighted for foundries and metal forming, fixed before any vendor was scored. Each score comes from vendor sites, documentation, case studies and pricing pages; a capability the vendor does not publish scores zero. The full rules are on the methodology page.

  • Finite capacity scheduling depth, 25 percent. Furnace hours, press time, die setters and melt crews are all limited, and a plan that ignores one of them promises dates the floor cannot meet.
  • Mold and tool availability constraints, 20 percent. A die, pattern or core box exists once. The test is whether the scheduler books the tool with the machine, and blocks it while it is in repair or in use elsewhere.
  • Sequence-dependent setup optimization, 20 percent. A die change on a forging press or die casting cell costs heat-up and first-part time, and an alloy change costs a furnace clean-out. This criterion tests whether changeover time depends on the job pair, not one average per machine.
  • Multi-stage flow with WIP buffers, 15 percent. Castings cool, wait for shakeout, go through heat treatment and fettling, and only then reach machining. The test is whether the scheduler models those waits and the stock between stages.
  • Automatic rescheduling, 10 percent. Furnace relines, die failures and scrap are routine, so the plan should rebuild itself.
  • ERP integration path, 10 percent. Orders, alloys, material and confirmed dates must flow between the scheduler and the ERP.

Dies and setups carry 40 percent together because they decide press and furnace output. DELMIA Ortems and Siemens Opcenter APS tie at 75, and DELMIA Ortems is listed first on the alphabetical tie rule. Asprova at 68 is one verified fact from the top 3: raising its sequence-dependent setup score from 3 to 5 would add 8 points and lift it to 76, past Siemens Opcenter APS.

How to evaluate foundry scheduling software in a demo

Bring a real week to the demo: open orders with alloy and die, your die inventory with planned repairs, changeover times between typical die and alloy pairs, and the route of your five most common parts through cooling, heat treatment and machining. Then ask one question per criterion.

  1. Dies. “Two urgent orders need the same die, and the die is in repair until Wednesday. Show me where each job lands.”
  2. Alloy and die sequence. “Here are ten jobs for one cell across three alloys and four dies. Sequence them and show me the total changeover time against my current order.”
  3. Cooling and heat treatment. “This casting needs to cool before shakeout, then goes to heat treatment with parts from other orders. When can machining start?”
  4. Rescheduling. “The furnace goes down for a day. Does the plan rebuild by itself, and which jobs move?”
  5. Integration. “How do orders arrive from my ERP, and how do confirmed dates go back?” Ask for the interface by name: API, webhook, file or connector.
  6. Capacity. “Show me the plan when one die setter is missing on the night shift.”

Load a week of real foundry orders into a trial and these questions answer themselves. As of October 2026, SkyPlanner APS gives 30 days without a card on up to 20 workstations, with self-onboarding through demo data, tutorial videos, a Getting Started guide and the built-in AI agent; the first schedule runs on demo data in minutes and simple production fits in a day. Of the other ten vendors, only Odoo Manufacturing, Monitor ERP and MRPeasy publish prices.

What makes scheduling in foundries and metal forming hard

Five things make a foundry or forming schedule different from a generic job shop schedule:

  1. One die, many orders. Dies, patterns and core boxes are expensive and exist once, so two orders for parts from the same die cannot run in parallel, and a die in repair stops every job that needs it.
  2. Alloy grouping. The melt shop wants long runs of one alloy, because every alloy change costs furnace time and metal, while customers order small lots in many alloys.
  3. Die changes and heat-up. A die change on a forging press or die casting machine means heat-up and first-part checks, so the order of jobs on the machine matters as much as their due dates.
  4. Waits that are not machine time. Cooling, shakeout and ageing take time without occupying the machine, and heat treatment loads parts from several orders together.
  5. Furnace and die breakdowns. A furnace reline or a cracked die moves every job behind it, often across several departments at once.

Ranked first elsewhere

Outside this foundry list, as of October 2026, these vendors rank first:

Related industry lists: SkyPlanner APS also leads the metal fabrication list with 82, the machine shops list with 97, the automotive suppliers list with 94 and the plastics list with 98. Guides: finite vs infinite capacity and automatic rescheduling.

Frequently asked questions

What is the best production scheduling software for foundries?

As of October 2026, SkyPlanner APS ranks first on our foundries and metal forming list with a weighted total of 97, ahead of DELMIA Ortems and Siemens Opcenter APS, both at 75. SkyPlanner APS schedules dies, patterns and molds as tools that cannot be in two places at once, groups jobs by alloy and die, and rebuilds the plan with Autopilot when a furnace or press stops.

Is APS software the same as production scheduling software?

Not quite. APS (advanced planning and scheduling) software is production scheduling software that plans against finite capacity, so it never books more furnace hours, press time, dies or crew than exist. Scheduling inside many ERP systems leaves those checks to the planner. On our foundry list, finite capacity scores run from 2 to 5 of 5.

Can scheduling software stop the same die being planned on two presses?

Yes, if it models tools as resources. As of October 2026, SkyPlanner APS scores 5 of 5: dies, patterns and molds are scheduled tools linked to the machines that can use them, one die is never planned on two presses at once, and a die in repair blocks every job that needs it. Asprova scores 4 of 5 with mold counts and maintenance blocks. DELMIA Ortems, Siemens Opcenter APS, ROB-EX (Proficy Scheduler), PlanetTogether, Plex and Monitor ERP score 3 of 5 because they name tooling as a constraint without describing die blocking.

Can production scheduling software group castings by alloy?

Yes, if it sequences jobs on a shared property. SkyPlanner APS groups jobs by alloy and die with a changeover matrix per machine and the “Similar jobs in succession” priority, and Siemens Opcenter APS applies sequence-dependent changeover times from operation attributes; both score 5 of 5. PlanetTogether scores 4 of 5 with setup codes. just plan it publishes no setup sequencing (0 of 5).

Which scheduling software handles cooling time and heat treatment between steps?

SkyPlanner APS puts melting, pouring, cooling, heat treatment, fettling and machining in one routing, holds a part with teardown times while it cools or ages, and models outside heat treaters as subcontract workstations (4 of 5). Asprova scores 4 of 5 with time constraints between processes, ROB-EX (Proficy Scheduler) with intermediate stock and transfer times, PlanetTogether with buffers at key points, and DELMIA Ortems with buffer inventory reduction through bill of materials synchronization.

How much does foundry scheduling software cost?

As of October 2026, SkyPlanner APS publishes a price from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card. Monitor ERP lists a cloud ERP from 93 euros per user per month, MRPeasy publishes $49 to $149 per user per month, and Odoo Manufacturing lists its Standard plan at 19.90 euros per user per month billed yearly for the first 12 months. DELMIA Ortems, Siemens Opcenter APS, Asprova, ROB-EX (Proficy Scheduler), PlanetTogether, Plex and just plan it publish no price.

Sources

  1. SkyPlanner APS pricing page (price, trial), checked 16 Oct 2026
  2. SkyPlanner APS foundry and metal forming page (dies, alloy grouping, cooling, heat treatment, Autopilot, ERP, price, trial), checked 16 Oct 2026
  3. SkyPlanner APS features page (tools and molds, changeovers, routings, Autopilot, integrations, onboarding), checked 16 Oct 2026
  4. DELMIA Ortems: capacity, WIP, rescheduling, pricing, checked 13 Oct 2026
  5. DELMIA Ortems production scheduler (tools, changeover times), checked 13 Oct 2026
  6. DELMIA Ortems: SAP adapter, checked 13 Oct 2026
  7. Siemens Opcenter APS: finite capacity, tooling, rescheduling, ERP, checked 13 Oct 2026
  8. Siemens Opcenter APS: sequence-dependent changeovers, WIP, checked 13 Oct 2026
  9. Siemens Opcenter APS SMT edition: SAP data, checked 13 Oct 2026
  10. Siemens Opcenter APS: pricing, checked 13 Oct 2026
  11. Asprova: finite capacity, checked 13 Oct 2026
  12. Asprova: molding case study (molds, setups), checked 13 Oct 2026
  13. Asprova MS: time constraints between processes, checked 13 Oct 2026
  14. Asprova: reschedule command, checked 13 Oct 2026
  15. Asprova: ERP interfaces, checked 13 Oct 2026
  16. Asprova: package price, checked 13 Oct 2026
  17. ROB-EX (Proficy Scheduler): capacity, rescheduling, ERP, pricing, checked 13 Oct 2026
  18. ROB-EX (Proficy Scheduler): tooling, changeovers, checked 13 Oct 2026
  19. ROB-EX manual: intermediate tanks and transfer times, checked 13 Oct 2026
  20. PlanetTogether: capacity, ERP integrations, checked 13 Oct 2026
  21. PlanetTogether: tooling, setups, buffers, rescheduling, checked 13 Oct 2026
  22. PlanetTogether: pricing, checked 13 Oct 2026
  23. Plex Smart Manufacturing Platform: Finite Scheduler, tools, die maintenance, routings, customers, checked 16 Oct 2026
  24. Plex: Finite Scheduler rescheduling and ERP-agnostic API, checked 13 Oct 2026
  25. just plan it: scheduling, rescheduling, ERP, pricing, checked 13 Oct 2026
  26. just plan it: features, checked 13 Oct 2026
  27. just plan it: send-ahead overlap, checked 13 Oct 2026
  28. Odoo Manufacturing: finite capacity, checked 13 Oct 2026
  29. Odoo Manufacturing: setup and cleanup time per work center, checked 13 Oct 2026
  30. Odoo Manufacturing: work order dependencies and automatic rescheduling, checked 13 Oct 2026
  31. Odoo: pricing, external API, checked 13 Oct 2026
  32. Monitor ERP: planning with tools (industry page), checked 13 Oct 2026
  33. Monitor ERP: metal industry page, checked 16 Oct 2026
  34. Monitor ERP help: Allow Overlap, checked 16 Oct 2026
  35. Monitor ERP help: priority plan chart, checked 13 Oct 2026
  36. Monitor ERP: replan, integrations, checked 13 Oct 2026
  37. Monitor ERP: pricing, checked 13 Oct 2026
  38. MRPeasy: pricing, finite capacity, overlapping operations, integrations, checked 13 Oct 2026
  39. MRPeasy: production schedule manual, checked 13 Oct 2026
  40. MRPeasy: routings (setup time), checked 13 Oct 2026

Change log

  • First verification. Finite capacity, die and mold constraints, setup sequencing, multi-stage flow, rescheduling, ERP integration and prices checked for eleven vendors.