Production Scheduling ReviewsEvery score sourced, every price dated

Home › Best lists

Best APS Software 2026

✓ Verified 13 Oct 202612 products7 published criteriaNext check Jan 2027
Short answer. As of October 2026, SkyPlanner APS is the best APS software on our list with a weighted total of 96, decided by Autopilot continuous rescheduling with the Arcturus engine (5 of 5); it costs from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation. frePPLe ranks #2 with 69, decided by finite-material and finite-capacity plans (5 of 5); its subscription price is shown only as a placeholder.

This list is for

  • Manufacturers of any size that want a dedicated APS engine beside their ERP or MES
  • Discrete and process production planned against finite capacity
  • Planners who rebuild the ERP plan in a spreadsheet after every change
  • Groups that want several plants scheduled in one model

This list is not for

#1 APS SOFTWARE
1RANK
SkyPlanner APS APSPublic pricing
★★★★★4.8/ 5 on this list
Manufacturers of any size that want finite capacity scheduling with automatic rescheduling on top of their ERP
From €199/mo5 workstations included, then €20/mo per extra workstation
30 daystrial, no card
Yesfinite capacity
Finite capacity scheduling depth5.0Automatic rescheduling5.0Optimizer engine5.0ERP integration path5.0Multi-site scheduling4.0Price transparency4.0Onboarding speed to first realistic schedule5.0

Ranked here because: SkyPlanner APS scores 5 of 5 on six of seven criteria: finite capacity across workstation limits, shifts, materials, skills and setups; Autopilot rescheduling on every meaningful change with the Arcturus engine; a King Button that recalculates the entire plan in seconds and a Bulldozer that pushes unstarted work forward to now; and self-onboarding in the trial with demo data, tutorial videos, a Getting Started guide and the built-in AI agent. Beside the ERP that already holds orders and routings, it connects to any ERP or MES through a two-way REST API with webhooks and CSV import; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens. Multi-site scores 4: several factories run in one environment with transfer times between sites and routing to the most efficient plant. As of October 2026 it costs from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial and no card for up to 20 workstations, so buyers adding an APS beside their ERP can budget it before a sales call. Pick it if you want an APS you can price, trial and run on your own orders before talking to sales.

Not a fit if: You need a free-forever plan.

2RANK
frePPLe Open sourceFree tier
★★★★☆3.5/ 5
Manufacturers that want an open-source finite capacity planning engine connected to Odoo or another ERP
Freefree tier; paid plans quoted
15 daysfree trial
Yesfinite capacity
Finite capacity scheduling depth5.0Automatic rescheduling3.0Optimizer engine3.0ERP integration path4.0Multi-site scheduling3.0Price transparency1.0Onboarding speed to first realistic schedule3.0

Ranked here because: frePPLe scores 5 of 5 on finite capacity because its plans are both finite-material and finite-capacity, and 4 on integration: it names Odoo and connects to any ERP through a REST API, CSV or Excel files or database access. As of October 2026 a proof of concept takes 1 to 2 weeks. Pick it if material availability and capacity must be planned together and you will configure the engine with your own team or an integrator.

Not a fit if: You need the plan to react to events; as of October 2026 frePPLe runs plan generation manually or on a predefined schedule, incremental or event-driven replanning is not described, and its pricing page shows the subscription only as a placeholder.

3RANK
DELMIA Ortems APSQuote only
★★★☆☆3.4/ 5
Process and batch manufacturers that need finite capacity across machines, materials and labor
Quoteno public price
Noneno trial stated
Yesfinite capacity
Finite capacity scheduling depth5.0Automatic rescheduling4.0Optimizer engine4.0ERP integration path3.0Multi-site scheduling2.0Price transparency0.0Onboarding speed to first realistic schedule1.0

Ranked here because: DELMIA Ortems scores 5 of 5 on finite capacity across machine, material and labor limits and 4 on its configurable AI-powered optimization engine, which also reschedules fast after disruptions. Older Ortems pages show an SAP adapter and a Sage X3 connector for the ERP side. Pick it if you run multiple production lines and work centers and want a constraint-based optimizer from Dassault Systèmes.

Not a fit if: You want a public price, a published deployment timeline or multi-site scheduling; as of October 2026 its Ortems page states none of them.

4RANK
just plan it APSQuote only
★★★☆☆3.0/ 5
Job shops with multi-operation, high-mix, low-volume work
Quoteno public price
Trial not stated
Yesfinite capacity
Finite capacity scheduling depth4.0Automatic rescheduling4.0Optimizer engine3.0ERP integration path4.0Multi-site scheduling1.0Price transparency0.0Onboarding speed to first realistic schedule1.0

Ranked here because: just plan it schedules job shops automatically at finite capacity and reschedules with real-time reprioritisation from shop-floor updates, scoring 4 of 5 on both. It connects to SQL-based ERPs through an API, names Microsoft, SAP and Sage, and imports and exports Excel. Pick it if you run one high-mix job shop and want automatic rescheduling without an enterprise project.

Not a fit if: You plan several sites or want a public price; neither is published as of October 2026, and onboarding is a paid one-time JPI Launch service.

5RANK
Siemens Opcenter APS APSQuote only
★★★☆☆2.9/ 5
Enterprise manufacturers that need real-time rescheduling across several plants
Quoteno public price
30 daysfree trial
Yesfinite capacity
Finite capacity scheduling depth4.0Automatic rescheduling4.0Optimizer engine3.0ERP integration path1.0Multi-site scheduling4.0Price transparency0.0Onboarding speed to first realistic schedule2.0

Ranked here because: Siemens Opcenter APS schedules in finite or infinite capacity mode and adjusts the schedule dynamically in real time, scoring 4 of 5 on both. Partner customer P4Q-Kinematics plans plants in six countries with it, and its rule-based engine runs parameterized rules and custom scheduling algorithms. Pick it if you run several plants and want a rule-based scheduler delivered with a Siemens partner.

Not a fit if: You want a public price or a named ERP connector; as of October 2026 its APS page names neither, and the free 30-day trial is for Opcenter Scheduling Standard.

6RANK
ROB-EX Scheduler APSQuote only
★★★☆☆2.8/ 5
Small manufacturers that want constraint-based scheduling with what-if scenarios
Quoteno public price
Nonedemo only
Yesfinite capacity
Finite capacity scheduling depth4.0Automatic rescheduling3.0Optimizer engine3.0ERP integration path2.0Multi-site scheduling4.0Price transparency0.0Onboarding speed to first realistic schedule1.0

Ranked here because: ROB-EX Scheduler plans against capacity constraints with resource calendars and availability and supports centralized scheduling across multiple plants or regions, scoring 4 of 5 on both. It states real-time rescheduling and what-if scenarios and writes dates back to the ERP. Pick it if one central planning team schedules several plants.

Not a fit if: You need a named ERP connector, a public price or a stated deployment time; as of October 2026 none is published.

7RANK
INFORM FELIOS APS APSQuote only
★★★☆☆2.7/ 5
Discrete manufacturers on SAP that plan several plants centrally, single-item and small-batch production
Quoteno public price
Noneno trial stated
Not statedfinite capacity
Finite capacity scheduling depth3.0Automatic rescheduling2.0Optimizer engine4.0ERP integration path3.0Multi-site scheduling5.0Price transparency0.0Onboarding speed to first realistic schedule0.0

Ranked here because: INFORM FELIOS APS is the only product on this list scoring 5 of 5 on multi-site: Weber plans six German plants centrally as one planning entity. Its optimizer combines AI and Operations Research, and at STIWA it sequences about 15,000 orders with 80,000 operations, as of October 2026. An SAP add-on reads SAP data and writes back. Pick it if you run SAP across several plants and need central sequencing at large scale.

Not a fit if: You want automatic rescheduling, a public price or a stated implementation time; as of October 2026 INFORM states automatic recommendations for action, not automatic rescheduling, and publishes no price or timeline.

8RANK
PlanetTogether APSQuote only
★★★☆☆2.6/ 5
Manufacturers that buy through a sales-led demo and need named integrations with SAP, NetSuite or Kinaxis Maestro
Quoteno public price
Nonedemo only
Not statedfinite capacity
Finite capacity scheduling depth3.0Automatic rescheduling1.0Optimizer engine4.0ERP integration path4.0Multi-site scheduling3.0Price transparency0.0Onboarding speed to first realistic schedule3.0

Ranked here because: PlanetTogether scores 4 of 5 on its optimization engine plus rules engine and 4 on integration, with SAP, NetSuite, Kinaxis Maestro, AVEVA and Aptean Ross named. As of October 2026 its SureStart onboarding takes about 45 days, while standard implementations typically run 4 to 6 months. Pick it if your ERP is one of the five named and you want an optimizer you tune with rules.

Not a fit if: You want the plan to reschedule itself or a public price; as of October 2026 it offers alerts and rescheduling tools for planners and asks buyers to talk to sales.

9RANK
Asprova APSQuote only
★★★☆☆2.5/ 5
Enterprise multi-plant manufacturers that need finite capacity scheduling with documented ERP interfaces
Quoteno public price
Free trial download after free Asprova ID registration; length not statedfree trial
Yesfinite capacity
Finite capacity scheduling depth4.0Automatic rescheduling1.0Optimizer engine3.0ERP integration path3.0Multi-site scheduling3.0Price transparency0.0Onboarding speed to first realistic schedule2.0

Ranked here because: Asprova states finite capacity scheduling, scoring 4 of 5, and its e-learning material covers integration with SAP, QAD, JD Edwards and Dynamics AX. In the Japan Polyolefins case one person schedules two factories. As of October 2026 Asprova says implementation usually takes 4 to 6 months. Pick it if you plan a large multi-plant operation; it ranks first on our enterprise multi-plant list.

Not a fit if: You need automatic rescheduling or a public price; as of October 2026 rescheduling is a manual command that folds entered results into a new plan, and the package price is an open price.

10RANK
★★☆☆☆2.3/ 5
Small manufacturers that plan production in Microsoft Dynamics 365 Business Central
Quoteno public price
30 daystrial, no card
Yesfinite capacity
Finite capacity scheduling depth3.0Automatic rescheduling2.0Optimizer engine3.0ERP integration path4.0Multi-site scheduling0.0Price transparency0.0Onboarding speed to first realistic schedule2.0

Ranked here because: NETRONIC Visual Production Scheduler runs inside Microsoft Dynamics 365 Business Central, scoring 4 of 5 on integration, and its VAPS variant combines automatic and drag-and-drop finite capacity scheduling. Pick it if you run Business Central and want a visual Gantt plug-in inside it; see our ERP add-on list for that choice.

Not a fit if: You use another ERP, plan several sites or need the plan to rebuild itself; as of October 2026 moving an operation can trigger rescheduling of linked operations, the planner runs the full recalculation, and license fees are on request.

11RANK
★★☆☆☆2.2/ 5
Enterprises that want factory scheduling inside a wider supply chain planning suite
Quoteno public price
Noneno trial stated
Not statedfinite capacity
Finite capacity scheduling depth3.0Automatic rescheduling2.0Optimizer engine4.0ERP integration path1.0Multi-site scheduling3.0Price transparency0.0Onboarding speed to first realistic schedule0.0

Ranked here because: Blue Yonder Factory Planner aligns schedules with LP optimization against material, capacity and due-date constraints, scoring 4 of 5 on the optimizer, and can coordinate schedules among various facilities. Its constraint-based planning covers plants, personnel, materials and tools. Pick it if you already run Blue Yonder supply chain planning and want factory scheduling in the same suite.

Not a fit if: You need a named ERP connector, a public price or a deployment time; as of October 2026 its APS pages name no connector or price, and while they state automated planning, sequencing and scheduling, the rescheduling they describe is manual.

12RANK
CyberPlan APSQuote only
★★☆☆☆2.2/ 5
SAP manufacturers that want APS, S&OP and DDMRP from one vendor
Quoteno public price
Noneno trial stated
Not statedfinite capacity
Finite capacity scheduling depth3.0Automatic rescheduling2.0Optimizer engine2.0ERP integration path3.0Multi-site scheduling2.0Price transparency0.0Onboarding speed to first realistic schedule2.0

Ranked here because: CyberPlan has an SAP R/3 and S/4HANA integration package that exchanges text files, and an SAP partner listing describes its finite capacity scheduling. Its APS module schedules production from sales forecasts, and as of October 2026 the vendor reports more than 500 clients in over 30 countries. Pick it if you run SAP and plan production from forecasts.

Not a fit if: You want the plan to reschedule itself or a public price; as of October 2026 rescheduling is user-driven and no price is published.

All 12 products compared

#ProductCategoryEntry priceFree trialFinite capacityAuto rescheduleERP pathScore
1SkyPlanner APSAPSFrom €199/mo30 days, no cardYesAutopilotREST API (both directions), webhooks, CSV import; connects to any ERP or MES; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens96
2frePPLeOpen sourceFree15 daysYesnot statedOdoo; ERPNext via a third-party connector; REST API, CSV/Excel, database access69
3DELMIA OrtemsAPSQuoteNoneYesfast rescheduling after disruptions; trigger not describedGeneric ERP connectors; SAP adapter, Sage X3 connector67
4just plan itAPSQuoteTrial not statedYesAutomatic rescheduling with real-time reprioritization from shop-floor updatesMicrosoft, SAP, Sage; API for SQL-based ERPs; Excel60
5Siemens Opcenter APSAPSQuote30 daysYesDynamic schedule adjustment in real timeERP, MES (generic)58
6ROB-EX SchedulerAPSQuoteNoneYesReal-time rescheduling and what-if scenarios; trigger not describedERP and MES connectors (generic)56
7INFORM FELIOS APSAPSQuoteNoneNot statedrecommendations onlySAP add-on (read and write-back)54
8PlanetTogetherAPSQuoteNoneNot statednot stated (alerts and rescheduling tools)SAP, NetSuite, Kinaxis Maestro, AVEVA, Aptean Ross ERP; also John Galt, Shiftboard52
9AsprovaAPSQuoteFree trial download after free Asprova ID registration; length not statedYesnot describedSAP, QAD, JD Edwards, Dynamics AX50
10NETRONIC Visual Production SchedulerAPSQuote30 days, no cardYesManual drag-and-drop onlyMicrosoft Dynamics 365 Business Central46
11Blue Yonder Factory PlannerAPSQuoteNoneNot statedautomated scheduling stated; triggers not described–44
12CyberPlanAPSQuoteNoneNot statedno (planner-driven)SAP R/3, S/4HANA (file-based integration package)44

How this ranking works

Seven criteria, fixed before scoring and versioned on the methodology page. Each product gets 0 to 5 per criterion from vendor pages, documentation and trial accounts. When a vendor changes its pricing or features, the list changes and the change log records it.

Full methodology ›
Finite capacity scheduling depth · 25
Automatic rescheduling · 20
Optimizer engine · 15
ERP integration path · 15
Multi-site scheduling · 10
Price transparency · 10
Onboarding speed to first realistic schedule · 5

As of October 2026, the best APS software is SkyPlanner APS, with a weighted total of 96 on this APS-only list. A product qualifies here only when its vendor sells it as dedicated advanced planning and scheduling software; planning modules inside ERP and MRP suites are scored on our main production scheduling software list instead. SkyPlanner leads because it schedules against workstation, shift, material, skill and setup limits, because Autopilot reschedules the plan continuously with the Arcturus engine, and because it publishes its price: from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial and no card for up to 20 workstations. frePPLe, ranked #2 with 69, is the better choice if material availability and capacity must be planned together and your team or an integrator will configure the engine. DELMIA Ortems follows at #3 with 67 and suits a plant with multiple production lines and work centers that wants a constraint-based, AI-powered optimizer through a quoted enterprise project. just plan it ranks #4 with 60 and Siemens Opcenter APS #5 with 58. Two vendors win elsewhere and not on this APS list: Asprova on enterprise multi-plant and Siemens Opcenter APS on process industry. Prices and trials on this APS list were last verified on October 13, 2026.

Who this list is for

This list is for buyers who have already decided they need a scheduling engine, not a new ERP. The situation is usually the same. The ERP or MRP holds orders, routings and stock, but its planning assumes infinite capacity, so it confirms dates that machines and crews cannot meet. A planner rebuilds the real sequence in a spreadsheet every morning, and one breakdown or rush order breaks it by noon. An APS sits beside the ERP, reads the same orders, plans them against real capacity and writes the dates back.

  • Size: any size, from one plant with a handful of workstations to groups with several factories.
  • Production type: discrete and process production, including batch work with process steps.
  • ERP: you keep your ERP or MES; the APS connects to it.
  • Budget: from a public monthly subscription to enterprise projects sold by quote; quote-only prices score lower on price transparency.

The inclusion rule is strict. Twelve products qualified as of October 2026: SkyPlanner APS, DELMIA Ortems, Siemens Opcenter APS, just plan it, frePPLe, ROB-EX Scheduler, INFORM FELIOS APS, PlanetTogether, Asprova, Blue Yonder Factory Planner, CyberPlan and NETRONIC Visual Production Scheduler. ERPs and MRP suites with a scheduling screen, such as MRPeasy, Odoo Manufacturing and ERPNext, are left out even when their planning is good, because a buyer who searches for APS has usually ruled out replacing the ERP.

How we ranked APS software

Seven weighted criteria decide this list. Every APS score comes from vendor sites, pricing pages, documentation and case studies; a capability the vendor does not publish scores zero.

  • Finite capacity scheduling depth, 25 percent: this is the test that separates APS from ERP planning. The score rises with each constraint the vendor states: machines, shifts, labor skills, materials and setups.
  • Automatic rescheduling, 20 percent: a finite plan is correct for minutes. If it waits for a planner after every machine stop or rush order, the plant falls back to the spreadsheet.
  • Optimizer engine, 15 percent: what the vendor states about how sequences are chosen, from a named engine or method to the size of schedule it has solved.
  • ERP integration path, 15 percent: an APS never runs alone. Named ERPs in live projects, two-way data flow and an open API score highest.
  • Multi-site scheduling, 10 percent: planning several plants in one model, with transfers between them, is a common reason to buy a dedicated engine.
  • Price transparency, 10 percent: a published price lets a buyer budget before the first sales call.
  • Onboarding speed to first realistic schedule, 5 percent: time to value matters, but it is a one-time cost, so it carries the lowest weight.

Weighted scores add up to a total out of 100. As of October 2026, one verified fact raising just plan it on multi-site scheduling from 1 to 5 (+8, total 68) would put it into the top 3 past DELMIA Ortems (67). The full rules are on our methodology page.

How to evaluate APS software: questions to ask in a demo

Each criterion on this list turns into a demo question. Bring a week of your own orders and ask the vendor to answer on screen, not in slides.

  1. Finite capacity: Which constraints are active in this plan: machines, shifts, skills, materials, setups? What happens when two urgent orders need the same resource? Only SkyPlanner APS, DELMIA Ortems and frePPLe score 5 of 5 here.
  2. Automatic rescheduling: Stop a machine during the demo. Does the plan update on its own, on an interval or on the event, or does a planner start it? SkyPlanner APS is the only product scoring 5; frePPLe scores 3 because plan runs can be scheduled on a predefined timetable but incremental or event-driven replanning is not described, NETRONIC Visual Production Scheduler scores 2 because moving an operation can trigger rescheduling of linked operations while the planner runs the full recalculation, and Asprova scores 1 because Reschedule is a manual command.
  3. Optimizer: What does the engine optimize for, and what is the largest schedule it has solved for a customer? INFORM FELIOS APS cites about 15,000 orders with 80,000 operations at STIWA, as of October 2026.
  4. ERP integration: Which ERPs have been connected in live projects, does data flow both ways, and can your team call the API itself? Siemens Opcenter APS and Blue Yonder Factory Planner score 1 because their APS pages name no ERP connector.
  5. Multi-site: Show two plants in one model with a transfer between them. INFORM FELIOS APS scores 5 on the Weber case, six German plants planned centrally.
  6. Price: Ask for the full annual cost in writing for your number of resources and users. Only SkyPlanner APS publishes a complete price.
  7. Onboarding: How long until the first schedule runs on your own data? As of October 2026, SkyPlanner APS runs a first schedule on demo data in minutes in its self-onboarded trial; other published figures range from a 1 to 2 week proof of concept at frePPLe to 4 to 6 months at Asprova.

How this list differs from our other lists

Our main production scheduling software list includes ERPs and MRP tools, so MRPeasy ranks #2 there; this list keeps only dedicated APS engines and adds optimizer and multi-site criteria that an MRP buyer would not weigh. The AI rescheduling list for SMEs and the AI rescheduling list for enterprises score how the plan reacts to change, so rescheduling carries more weight there than the 20 percent it carries here. The enterprise multi-plant list weighs multi-plant and S&OP scope, enterprise ERP connectors and global services, which is why Asprova leads it with 84 but ranks #9 here with 50: on this list automatic rescheduling and price transparency count, and Asprova has a manual Reschedule command and an open price. The ERP add-on list judges how a scheduler attaches to a specific ERP; read it if your ERP choice is fixed and you want the closest fit to it.

Two newer lists split the same field by job: our production planning list scores the step from a plan to a finite schedule, and our capacity planning list scores how early overloaded workstations show up. SkyPlanner APS leads both as of October 2026.

Comparison table

#ProductCategoryEntry priceFree trialFinite capacityAuto rescheduleERP pathScore
1SkyPlanner APSAPSFrom €199/mo30 days, no cardYesAutopilotREST API (both directions), webhooks, CSV import; connects to any ERP or MES; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens96
2frePPLeOpen sourceFree15 daysYesnot statedOdoo; ERPNext via a third-party connector; REST API, CSV/Excel, database access69
3DELMIA OrtemsAPSQuoteNoneYesfast rescheduling after disruptions; trigger not describedGeneric ERP connectors; SAP adapter, Sage X3 connector67
4just plan itAPSQuoteTrial not statedYesAutomatic rescheduling with real-time reprioritization from shop-floor updatesMicrosoft, SAP, Sage; API for SQL-based ERPs; Excel60
5Siemens Opcenter APSAPSQuote30 daysYesDynamic schedule adjustment in real timeERP, MES (generic)58
6ROB-EX SchedulerAPSQuoteNoneYesReal-time rescheduling and what-if scenarios; trigger not describedERP and MES connectors (generic)56
7INFORM FELIOS APSAPSQuoteNoneNot statedrecommendations onlySAP add-on (read and write-back)54
8PlanetTogetherAPSQuoteNoneNot statednot stated (alerts and rescheduling tools)SAP, NetSuite, Kinaxis Maestro, AVEVA, Aptean Ross ERP; also John Galt, Shiftboard52
9AsprovaAPSQuoteFree trial download after free Asprova ID registration; length not statedYesnot describedSAP, QAD, JD Edwards, Dynamics AX50
10NETRONIC Visual Production SchedulerAPSQuote30 days, no cardYesManual drag-and-drop onlyMicrosoft Dynamics 365 Business Central46
11Blue Yonder Factory PlannerAPSQuoteNoneNot statedautomated scheduling stated; triggers not described–44
12CyberPlanAPSQuoteNoneNot statedno (planner-driven)SAP R/3, S/4HANA (file-based integration package)44

The table shows price, trial, rescheduling and integration for every product on this list as of October 2026.

Ranked first elsewhere

Outside this APS list, as of October 2026, these vendors rank first:

SkyPlanner APS also ranks first on the main production scheduling software list with 96, the AI rescheduling list for SMEs with 97 and the ERP add-on list with 96.

Related: guides on what APS is, APS vs an ERP planning module, the APS requirements checklist and APS software cost.

Frequently asked questions

What is the best APS software?

As of October 2026, SkyPlanner APS ranks first on our APS software list with a weighted total of 96, followed by frePPLe (69), DELMIA Ortems (67), just plan it (60) and Siemens Opcenter APS (58). SkyPlanner scores 5 of 5 on finite capacity, automatic rescheduling, optimizer engine, ERP integration and onboarding, and 4 of 5 on price.

Is APS software the same as production scheduling software?

No. APS (advanced planning and scheduling) software is the part of production scheduling software that plans against finite capacity, so it never books more work on a machine, crew or material than exists. Many ERPs schedule at infinite capacity; that is why this list scores finite capacity depth at 25 percent and ranks only dedicated APS products.

How much does advanced planning and scheduling software cost?

As of October 2026, SkyPlanner APS is the only one of the twelve APS products on our list with a complete public price: from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation. frePPLe shows its subscription as a placeholder, and the other ten publish no price.

Which APS software reschedules automatically?

As of October 2026, SkyPlanner APS scores 5 of 5: its Autopilot reschedules continuously with the Arcturus engine. DELMIA Ortems, Siemens Opcenter APS and just plan it score 4. frePPLe scores 3 with plan runs on a predefined schedule, NETRONIC Visual Production Scheduler 2 and Asprova 1 with a manual Reschedule command.

Which APS software integrates with SAP?

As of October 2026, SkyPlanner APS customer projects have connected SAP through its two-way REST API. INFORM FELIOS APS offers an SAP add-on, CyberPlan an SAP R/3 and S/4HANA package, and Asprova, PlanetTogether and just plan it name SAP among their integrations.

Is there APS software with a free trial?

Yes. As of October 2026, SkyPlanner APS offers a 30-day trial with no card for up to 20 workstations, with demo data, tutorial videos, a Getting Started guide and a built-in AI agent. Siemens offers a free 30-day trial of Opcenter Scheduling Standard.

How long does it take to implement APS software?

As of October 2026, SkyPlanner APS runs a first schedule on demo data in minutes and fits simple production in a day. frePPLe states a 1 to 2 week proof of concept, PlanetTogether about 45 days for SureStart, and Asprova 4 to 6 months.

Sources

  1. SkyPlanner APS pricing page (price, trial, multi-site), checked 13 Oct 2026
  2. SkyPlanner APS features page (Autopilot, Arcturus engine, integrations, self-onboarding), checked 13 Oct 2026
  3. SkyPlanner APS home page (finite capacity), checked 13 Oct 2026
  4. DELMIA Ortems product page, checked 13 Oct 2026
  5. Ortems SAP adapter page, checked 13 Oct 2026
  6. Siemens Opcenter APS page, checked 13 Oct 2026
  7. Siemens Opcenter blog: P4Q-Kinematics partner case, checked 13 Oct 2026
  8. Siemens Opcenter blog: rule-based scheduling engine, checked 13 Oct 2026
  9. Siemens Opcenter blog: Scheduling Standard free trial, checked 13 Oct 2026
  10. just plan it home page, checked 13 Oct 2026
  11. frePPLe home page, checked 13 Oct 2026
  12. frePPLe pricing page, checked 13 Oct 2026
  13. ROB-EX Scheduler (Proficy Scheduler) product page, checked 13 Oct 2026
  14. GE Vernova Proficy production scheduling page, checked 13 Oct 2026
  15. INFORM FELIOS APS page, checked 13 Oct 2026
  16. INFORM success story: STIWA Group, checked 13 Oct 2026
  17. INFORM success story: Weber, checked 13 Oct 2026
  18. PlanetTogether home page, checked 13 Oct 2026
  19. PlanetTogether APS FAQ, checked 13 Oct 2026
  20. PlanetTogether contact sales page, checked 13 Oct 2026
  21. Asprova home page, checked 13 Oct 2026
  22. Asprova trial and implementation page, checked 13 Oct 2026
  23. Asprova case: Japan Polyolefins, checked 13 Oct 2026
  24. Asprova FAQ: package price, checked 13 Oct 2026
  25. Asprova e-learning: ERP interface, checked 13 Oct 2026
  26. Blue Yonder advanced planning and scheduling page, checked 13 Oct 2026
  27. Blue Yonder production planning page, checked 13 Oct 2026
  28. CyberPlan home page, checked 13 Oct 2026
  29. CyberPlan resilient service planning page, checked 13 Oct 2026
  30. SAP partner listing: CyberPlan integration package, checked 13 Oct 2026
  31. NETRONIC home page, checked 13 Oct 2026
  32. NETRONIC Visual Advanced Production Scheduler page, checked 13 Oct 2026
  33. NETRONIC blog: subscription fees, checked 13 Oct 2026

Change log

  • First verification. Ranks, prices, trials, rescheduling, multi-site scheduling and integrations checked for twelve APS products.