Production Scheduling ReviewsEvery score sourced, every price dated

Home › Best lists

Best Production Scheduling Software for Electrical Equipment Manufacturers 2026

✓ Verified 16 Oct 202611 products6 published criteriaNext check Jan 2027
Short answer. As of October 2026, SkyPlanner APS ranks #1 for electrical equipment manufacturers with 100 of 100, because sub-assemblies such as busbars and enclosures are scheduled into the finished panel in the right order and a job starts only when its breakers, relays and other components will be there. Siemens Opcenter APS ranks #2 with 78, because it plans at BOM level with material constraints and adjusts the schedule in real time.

This list is for

  • Switchgear, switchboard and control panel builders assembling to customer orders
  • Transformer, motor and generator manufacturers with winding, assembly and test stages
  • Cable, wire and wiring harness producers running extrusion, cutting, crimping and assembly lines
  • Lighting, enclosure and electrical component manufacturers of any size, from one plant to several

This list is not for

#1 ELECTRICAL EQUIPMENT MANUFACTURERS
1RANK
SkyPlanner APS APSPublic pricing
★★★★★5.0/ 5 on this list
Manufacturers of any size that want finite capacity scheduling with automatic rescheduling on top of their ERP
PriceFrom €199/mo 5 workstations included, then €20/mo per extra workstation
Free trial30 days trial, no card
Finite capacityYes
Finite capacity scheduling depth5.0Multi-stage routing with assembly dependencies5.0Component availability constraints5.0Automatic rescheduling5.0ERP integration path5.0Capable-to-promise delivery dates5.0

Ranked here because: SkyPlanner APS ranks #1 with 100 and scores 5 of 5 on all six electrical equipment criteria. Its visual editor maps sub-products, process steps, setup times and the dependencies between them, so a switchboard is planned from busbars and enclosures up to the finished line-up, with due dates on individual steps. With material-based scheduling on, a job starts only when its materials and components will be there, so long-lead breakers and relays gate the jobs that need them and need dates flow back to purchasing. Shared test fixtures are never booked twice, testing can start before a whole batch is finished, and cable lines are sequenced by a changeover matrix built on product properties. Autopilot reschedules on an interval or an event with the Arcturus engine when a delivery slips or a test fails, and a sales prospect can be scheduled as a simulated order to quote a date from real load on bays, test stations and cable lines. It connects to any ERP or MES through its two-way REST API, with webhooks and CSV import; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens. As of October 2026 the price starts from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card for up to 20 workstations. Pick it if you build panels, transformers, motors, harnesses or luminaires to order, at any size, and want the plan to rebuild itself when a component delivery moves.

Not a fit if: You need a free-forever plan.

2RANK
Siemens Opcenter APS APSQuote only
★★★★☆3.9/ 5
Enterprise manufacturers that need real-time rescheduling across several plants
PriceQuote no public price
Free trial30 days
Finite capacityYes
Finite capacity scheduling depth4.0Multi-stage routing with assembly dependencies4.0Component availability constraints4.0Automatic rescheduling4.0ERP integration path3.0Capable-to-promise delivery dates4.0

Ranked here because: Siemens Opcenter APS ranks #2 with 78 and scores 4 of 5 on five criteria. It lists BOM level planning and assembly process visualization with material constraints, builds schedules from material availability and location, schedules in finite or infinite capacity mode and adjusts the schedule dynamically in real time. Capable-to-promise is listed in Opcenter Scheduling Standard, and the APS supports due date negotiation. Pick it if you run a large switchgear or drives plant with a dedicated planning team and buy through a sales-led enterprise process.

Not a fit if: You want a public price or a named ERP connector outside the SMT edition; as of October 2026 Siemens publishes no price and names SAP only for its SMT edition.

3RANK
DELMIA Ortems APSQuote only
★★★★☆3.8/ 5
Process and batch manufacturers that need finite capacity across machines, materials and labor
PriceQuote no public price
Free trialNone no trial stated
Finite capacityYes
Finite capacity scheduling depth5.0Multi-stage routing with assembly dependencies3.0Component availability constraints4.0Automatic rescheduling4.0ERP integration path3.0Capable-to-promise delivery dates2.0

Ranked here because: DELMIA Ortems ranks #3 with 75. Its 5 of 5 on finite capacity covers machine, material and labor limits together, and its Synchronized Requirements Planner treats raw material constraints across BOM levels (4 of 5 on components). The optimization engine reschedules fast after disruptions (4 of 5), and older Ortems pages document an SAP adapter and a Sage X3 connector. Pick it if winding machines, test bays and skilled assemblers are all short at once and you run SAP or Sage X3.

Not a fit if: Sales needs order promising; Ortems tests new orders through what-if simulation but describes no order-promising function (2 of 5), and Dassault Systemes publishes no price as of October 2026.

4RANK
just plan it APSQuote only
★★★☆☆3.4/ 5
Job shops with multi-operation, high-mix, low-volume work
PriceQuote no public price
Free trialTrial not stated
Finite capacityYes
Finite capacity scheduling depth4.0Multi-stage routing with assembly dependencies3.0Component availability constraints2.0Automatic rescheduling4.0ERP integration path4.0Capable-to-promise delivery dates4.0

Ranked here because: just plan it ranks #4 with 68. It states automatic finite scheduling (4 of 5) and automatic rescheduling with real-time reprioritization from shop-floor updates (4 of 5). The realistic delivery date shows the second a new job hits the schedule (4 of 5 on capable-to-promise), and it connects to SQL-based ERPs through an API, naming Microsoft, SAP and Sage (4 of 5). Pick it if you run a job-shop style panel or harness shop and want a simple board that replans itself.

Not a fit if: Component shortages drive your schedule; just plan it only lets the earliest start wait for a material delivery date and describes no stock or BOM check (2 of 5), and publishes no price as of October 2026.

5RANK
Asprova APSQuote only
★★★☆☆3.1/ 5
Enterprise multi-plant manufacturers that need finite capacity scheduling with documented ERP interfaces
PriceQuote no public price
Free trialFree trial download after free Asprova ID registration; length not stated
Finite capacityYes
Finite capacity scheduling depth4.0Multi-stage routing with assembly dependencies3.0Component availability constraints3.0Automatic rescheduling1.0ERP integration path3.0Capable-to-promise delivery dates4.0

Ranked here because: Asprova shares fifth place with 61, tied with ROB-EX (Proficy Scheduler) and Epicor Kinetic. It states finite capacity scheduling (4 of 5), and its Visual Management module gives quick and accurate delivery date quotations (4 of 5). Assembly operations wait for their input items, and e-learning material covers SAP, QAD, JD Edwards and Dynamics AX interfaces (3 of 5 on both). Pick it if you plan a long horizon of motor or transformer orders with an in-house planner.

Not a fit if: You need automatic rescheduling or a public price; Asprova documents reschedule as a manual command (1 of 5), and its package price is an open price as of October 2026.

6RANK
Epicor Kinetic MRP-ERPQuote only
★★★☆☆3.1/ 5
Discrete and make-to-order manufacturers, single-site or multi-site, that want ERP, MRP and advanced planning and scheduling in one system
PriceQuote no public price
Free trialNone demo only
Finite capacityNot stated
Finite capacity scheduling depth4.0Multi-stage routing with assembly dependencies3.0Component availability constraints3.0Automatic rescheduling1.0ERP integration path3.0Capable-to-promise delivery dates4.0

Ranked here because: Epicor Kinetic shares fifth place with 61, tied with ROB-EX (Proficy Scheduler) and Asprova. Kinetic APS adds multiple-constraint, capability-based finite scheduling (4 of 5) and real-time capable-to-promise (4 of 5), and multilevel MRP runs across plants (3 of 5 on assemblies). It lists advanced material planning, and its Open REST API exposes Kinetic services through OData v4 (3 of 5 on components and on ERP). Pick it if you are replacing your ERP and want MRP, quoting and scheduling for panels or motors in one Epicor system.

Not a fit if: You want to keep your current ERP or need the plan to update itself; Epicor describes a change impact informer that tests changes before committing, not automatic rescheduling (1 of 5), and publishes no price as of October 2026.

7RANK
ROB-EX Scheduler APSQuote only
★★★☆☆3.1/ 5
Small manufacturers that want constraint-based scheduling with what-if scenarios
PriceQuote no public price
Free trialNone demo only
Finite capacityYes
Finite capacity scheduling depth4.0Multi-stage routing with assembly dependencies2.0Component availability constraints4.0Automatic rescheduling3.0ERP integration path2.0Capable-to-promise delivery dates2.0

Ranked here because: ROB-EX (Proficy Scheduler) shares fifth place with 61, tied with Asprova and Epicor Kinetic. It checks schedules against finite capacity and material availability (4 of 5 on both) with resource calendars, and states real-time rescheduling and what-if scenarios (3 of 5). Pick it if your cable or wire plant behaves like a line process where capacity and material checks matter more than assembly structures.

Not a fit if: You build multi-level assemblies such as switchboards; ROB-EX describes dependency management for project manufacturing but no multi-level BOM scheduling (2 of 5), and names no ERP as of October 2026.

8RANK
Odoo Manufacturing Open sourcePublic pricing
★★★☆☆3.0/ 5
Small manufacturers that want finite capacity planning inside the Odoo ERP
Price€19.90/user/mo per user
Free trialFree tier One App Free: one app,…
Finite capacityYes
Finite capacity scheduling depth3.0Multi-stage routing with assembly dependencies4.0Component availability constraints3.0Automatic rescheduling3.0ERP integration path3.0Capable-to-promise delivery dates1.0

Ranked here because: Odoo Manufacturing ranks #8 with 60. It scores 4 of 5 on assemblies because a BOM can sit inside a BOM, routings sequence work orders and the next blocked operation is released automatically. It tracks component availability alongside production time (3 of 5), and linked work orders reschedule automatically with the default Auto-Reschedule (Keep Buffer) setting (3 of 5). As of October 2026, Odoo's Standard plan costs 19.90 euros per user per month billed yearly, a rate Odoo marks as a first-year discount. Pick it if you want a low-cost ERP with planning built in for a small panel or lighting plant.

Not a fit if: Sales promises dates from capacity; Odoo suggests a delivery date from the confirmation date plus customer lead time without using capacity (1 of 5).

9RANK
MRPeasy MRP-ERPPublic pricing
★★★☆☆3.0/ 5
Small manufacturers that want MRP, inventory and accounting connections in one cloud tool
Price$49/user/mo per user
Free trial15+15 days trial, no card
Finite capacityYes
Finite capacity scheduling depth3.0Multi-stage routing with assembly dependencies3.0Component availability constraints4.0Automatic rescheduling2.0ERP integration path2.0Capable-to-promise delivery dates3.0

Ranked here because: MRPeasy ranks #9 with 59. Under finite capacity a job starts only when its materials are on hand (4 of 5 on components), and it handles single and multi-level BOMs with finite capacity operations scheduling (3 of 5). As of October 2026 it publishes prices from $49 to $149 per user per month. Pick it if you are a small electrical assembler that wants inventory, purchasing and scheduling in one low-cost tool.

Not a fit if: The plan should replan itself; MRPeasy replans unstarted orders on a quantity change, while started operations are replanned manually (2 of 5).

10RANK
PlanetTogether APSQuote only
★★★☆☆2.8/ 5
Manufacturers that buy through a sales-led demo and need named integrations with SAP, NetSuite or Kinaxis Maestro
PriceQuote no public price
Free trialNone demo only
Finite capacityNot stated
Finite capacity scheduling depth3.0Multi-stage routing with assembly dependencies2.0Component availability constraints4.0Automatic rescheduling1.0ERP integration path4.0Capable-to-promise delivery dates3.0

Ranked here because: PlanetTogether ranks #10 with 56. It validates the plan against actual material arrival dates and alerts on material availability (4 of 5), and it names integrations with SAP, NetSuite, Kinaxis Maestro, AVEVA and Aptean Ross (4 of 5). Pick it if you run one of those systems and a planner will drive every replan.

Not a fit if: Assembly structures or automatic replanning decide your schedule; PlanetTogether describes no assembly structures (2 of 5) and only alerts and rescheduling tools for planners (1 of 5), with no price as of October 2026.

11RANK
INFORM FELIOS APS APSQuote only
★★★☆☆2.8/ 5
Discrete manufacturers on SAP that plan several plants centrally, single-item and small-batch production
PriceQuote no public price
Free trialNone no trial stated
Finite capacityNot stated
Finite capacity scheduling depth3.0Multi-stage routing with assembly dependencies3.0Component availability constraints3.0Automatic rescheduling2.0ERP integration path3.0Capable-to-promise delivery dates2.0

Ranked here because: INFORM FELIOS ranks #11 with 55. Its project and assembly planning considers capacities, deadlines, materials and working areas at once, from design to assembly (3 of 5), and it shows when which materials are needed (3 of 5). Its SAP add-on reads SAP data and writes back (3 of 5). Pick it if you run SAP and build large engineered switchgear or transformer projects.

Not a fit if: You need automatic rescheduling or order promising; INFORM describes recommendations for action rather than automatic replanning (2 of 5) and publishes no price as of October 2026.

All 11 products compared

#ProductCategoryEntry priceFree trialFinite capacityAuto rescheduleERP pathScore
1SkyPlanner APSAPSFrom €199/mo30 days, no cardYesAutopilotREST API (both directions), webhooks, CSV import; connects to any ERP or MES; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens100
2Siemens Opcenter APSAPSQuote30 daysYesDynamic schedule adjustment in real timeERP, MES (generic)78
3DELMIA OrtemsAPSQuoteNoneYesfast rescheduling after disruptions; trigger not describedGeneric ERP connectors; SAP adapter, Sage X3 connector75
4just plan itAPSQuoteTrial not statedYesAutomatic rescheduling with real-time reprioritization from shop-floor updatesMicrosoft, SAP, Sage; API for SQL-based ERPs; Excel68
5AsprovaAPSQuoteFree trial download after free Asprova ID registration; length not statedYesnot describedSAP, QAD, JD Edwards, Dynamics AX61
6Epicor KineticMRP-ERPQuoteNoneNot statedChange impact informer tests schedule changes before commit; continuous automatic rescheduling not documentedNative ERP; REST and OData APIs with OpenAPI and Swagger, off-the-shelf integrations, iPaaS61
7ROB-EX SchedulerAPSQuoteNoneYesReal-time rescheduling and what-if scenarios; trigger not describedERP and MES connectors (generic)61
8Odoo ManufacturingOpen source€19.90/user/moFree tierYesDependent work orders reschedule when a planner moves one in the GanttNative ERP; external API on the Custom plan only60
9MRPeasyMRP-ERP$49/user/mo15+15 days, no cardYespartial (quantity change on unstarted order replans)Native ERP; QuickBooks Online, Xero, Salesforce, HubSpot, Shopify, WooCommerce, Zapier, EDI; API and webhooks on paid plans59
10PlanetTogetherAPSQuoteNoneNot statednot stated (alerts and rescheduling tools)SAP, NetSuite, Kinaxis Maestro, AVEVA, Aptean Ross ERP; also John Galt, Shiftboard56
11INFORM FELIOS APSAPSQuoteNoneNot statedrecommendations onlySAP add-on (read and write-back)55

How this ranking works

Six criteria, fixed before scoring and versioned on the methodology page. Each product gets 0 to 5 per criterion from vendor pages, documentation and trial accounts. When a vendor changes its pricing or features, the list changes and the change log records it.

Full methodology ›
Finite capacity scheduling depth · 25
Multi-stage routing with assembly dependencies · 20
Component availability constraints · 20
Automatic rescheduling · 15
ERP integration path · 10
Capable-to-promise delivery dates · 10

As of October 2026, the best production scheduling software for electrical equipment manufacturers is SkyPlanner APS, with a weighted total of 100 out of 100. It leads because sub-assemblies such as busbars, enclosures and wired doors are scheduled into the finished panel in the right order, and because a job starts only when its breakers, relays and other components will be there. When a component delivery slips or a routine test fails, Autopilot rebuilds the plan with the Arcturus engine, and sales can schedule a quoted order as a simulation against real load on assembly bays, test stations and cable lines. It connects to any ERP or MES through its two-way REST API, with webhooks and CSV import; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens. An electrical plant can see the price before any call: from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card for up to 20 workstations. Siemens Opcenter APS, ranked #2 with 78, is the better choice for a large plant with a planning team that buys through an enterprise sales process. DELMIA Ortems ranks #3 with 75 for plants where machine, material and labor limits bind together. SkyPlanner APS also ranks first on our AI rescheduling list for enterprises (91) and our enterprise multi-plant list (81). Prices and trials on this electrical equipment list were last verified on 16 October 2026.

Who this list is for

This list is for plants that build electrical equipment to customer orders or short series: switchgear and switchboards, control panels and enclosures, distribution and power transformers, motors and generators, cables, wires and wiring harnesses, and luminaires. The scheduling question in these plants is rarely raw machine hours. It is whether every component for a panel will be on the shelf when the bay is free, and whether the test station can take the unit on the day sales promised.

A typical week looks like this. A switchboard order needs a cut and punched enclosure, bent busbars, a mounting plate wired at the bench and a door with meters, all finished before final assembly. Breakers and relays arrive on their own lead times, and one late part holds the whole line-up. Transformers wait on winding and drying before tanking and test, and harness lines change over between wire gauges and connector families. Most planners hold this together in a spreadsheet next to the ERP. The software on this list replaces that spreadsheet with a schedule that ties sub-assemblies to the final product, holds jobs until components arrive and gives sales a date it can keep.

  • Size: any size, from a single panel shop to a group with several plants.
  • Production type: assemble to order, configure to order and short series with multi-level bills of materials.
  • ERP: with or without one; a scheduler that takes orders and stock from your ERP, or an ERP with planning built in.
  • Budget: from a public monthly subscription to enterprise systems sold by quote.

How we ranked production scheduling software for electrical equipment manufacturers

Six criteria are weighted for electrical equipment, fixed before any vendor was scored. Each score comes from vendor sites, documentation, case studies and pricing pages; a capability the vendor does not publish scores zero. The full rules are on the methodology page.

  • Finite capacity scheduling depth, 25 percent. Assembly bays, winding machines, test stations and skilled wiremen are all limited, and a plan that ignores one of them promises dates the floor cannot meet.
  • Multi-stage routing with assembly dependencies, 20 percent. Enclosures, busbars, wired plates and doors must all finish before final assembly. The test is whether the scheduler links sub-assemblies to the parent across BOM levels.
  • Component availability constraints, 20 percent. Breakers, relays, drives and copper arrive on long and shifting lead times. The test is whether a job waits for its components instead of starting on paper.
  • Automatic rescheduling, 15 percent. A late delivery or a failed test changes the sequence, so the plan should rebuild without a planner redoing it.
  • ERP integration path, 10 percent. Orders, stock and purchase dates live in the ERP and must flow both ways.
  • Capable-to-promise delivery dates, 10 percent. Panel and transformer buyers want a delivery date with the quote, calculated from real load.

Assemblies and components carry 40 percent together because a missing part or an unfinished sub-assembly, not a machine, is what stops most electrical lines. Siemens Opcenter APS and DELMIA Ortems sit 3 points apart, and the boundary of the top three is close: one verified fact raising just plan it on multi-stage routing from 3 to 5 would add 8 points and lift it to 76, past Ortems at 75. Three vendors share fifth place on 61: ROB-EX (Proficy Scheduler), Asprova and Epicor Kinetic.

What makes scheduling in electrical equipment manufacturing hard

Four things make an electrical equipment schedule different from a generic job shop schedule:

  1. Deep assembly structures. A switchboard or a motor is built from sub-assemblies that run on different workstations, and the final assembly cannot start until the last of them is done.
  2. Long-lead components. Breakers, relays, drives and specialty copper set the real start date, and their delivery dates move after the schedule is published.
  3. Test bottlenecks. Routine and type tests run on a few stations with shared fixtures, and a failed test sends a unit back into the queue.
  4. Changeovers on cable and harness lines. Wire gauge, insulation and connector family changes cost line time that depends on what ran before.

How this list differs from our other lists

The electronics list is the closest neighbor: it shares the component availability criterion but weights SMT setup families instead of assembly dependencies; SkyPlanner APS leads it with 94. Plants that engineer each switchgear or transformer project from scratch fit the engineer-to-order list, led by SkyPlanner APS with 100. Panel and harness shops that build each order once fit the make-to-order list, led by SkyPlanner APS with 98. Enclosure and busbar fabrication on its own belongs on the metal fabrication list, led by SkyPlanner APS with 82.

Ranked first elsewhere

Outside this electrical equipment list, as of October 2026, these vendors rank first:

Related: guides on finite vs infinite capacity and automatic rescheduling; industry lists for electronics, engineer to order, make to order, metal fabrication and contract manufacturers.

Frequently asked questions

What is the best production scheduling software for electrical equipment manufacturers?

As of October 2026, SkyPlanner APS ranks first on our electrical equipment list with a weighted total of 100, ahead of Siemens Opcenter APS with 78 and DELMIA Ortems with 75. SkyPlanner APS schedules sub-assemblies into the final product, holds each job until its components will be there, and reschedules automatically with Autopilot.

Is APS software the same as production scheduling software?

Not quite. APS (advanced planning and scheduling) software is production scheduling software that plans against finite capacity and material limits, so it never books more bay hours, test station time or components than exist. Scheduling inside many ERP systems leaves those checks to the planner. On our electrical equipment list, finite capacity scores run from 3 to 5 of 5.

Can scheduling software hold a panel job until breakers and relays arrive?

Yes, if it treats component availability as a constraint. As of October 2026, SkyPlanner APS scores 5 of 5 on our electrical equipment list: with material-based scheduling on, a job starts only when its materials and components will be there, and the job moves when a delivery slips. Siemens Opcenter APS, DELMIA Ortems, ROB-EX (Proficy Scheduler), MRPeasy and PlanetTogether score 4 of 5, and just plan it scores 2 of 5 because it only lets the earliest start wait for a material delivery date.

Which software schedules sub-assemblies and final assembly together for switchgear?

As of October 2026, SkyPlanner APS scores 5 of 5 on multi-stage routing with assembly dependencies: sub-products feed the main product and a panel is planned from busbars and enclosures up to the finished line-up. Siemens Opcenter APS and Odoo Manufacturing score 4 of 5, through BOM level planning and nested BOMs. PlanetTogether and ROB-EX (Proficy Scheduler) score 2 of 5 because neither describes multi-level assembly scheduling.

How much does production scheduling software for electrical manufacturers cost?

As of October 2026, SkyPlanner APS publishes a price from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation. MRPeasy publishes $49 to $149 per user per month, and Odoo Manufacturing lists its Standard plan at 19.90 euros per user per month billed yearly for the first year. Siemens Opcenter APS, DELMIA Ortems, just plan it, ROB-EX (Proficy Scheduler), Asprova, Epicor Kinetic, PlanetTogether and INFORM FELIOS publish no price.

Can scheduling software give sales a realistic delivery date for a transformer or panel order?

As of October 2026, SkyPlanner APS scores 5 of 5: a sales prospect is scheduled as a simulated order against real load on bays, test stations and cable lines, and becomes a production order when won. Siemens Opcenter APS, just plan it, Asprova and Epicor Kinetic score 4 of 5 through capable-to-promise or delivery date quotation functions. Odoo Manufacturing scores 1 of 5 because its suggested date ignores capacity.

Sources

  1. SkyPlanner APS pricing page (price, trial), checked 16 Oct 2026
  2. SkyPlanner APS features page (finite capacity, Autopilot, integrations, onboarding), checked 16 Oct 2026
  3. SkyPlanner APS electrical equipment page (assemblies, components, test fixtures, cable lines, delivery dates), checked 16 Oct 2026
  4. Siemens Opcenter APS: finite capacity, BOM level planning, rescheduling, checked 16 Oct 2026
  5. Siemens Opcenter Scheduling: material availability (fact sheet), checked 16 Oct 2026
  6. Siemens Opcenter Scheduling SMT: SAP integration, checked 16 Oct 2026
  7. Siemens Opcenter Scheduling Standard: capable-to-promise, checked 16 Oct 2026
  8. DELMIA Ortems: capacity, materials, rescheduling, what-if, checked 16 Oct 2026
  9. DELMIA Ortems: SAP adapter, checked 16 Oct 2026
  10. just plan it: scheduling, rescheduling, ERP, checked 16 Oct 2026
  11. just plan it: job shop scheduling, delivery dates, dependencies, checked 16 Oct 2026
  12. just plan it: material delivery as earliest start, checked 16 Oct 2026
  13. ROB-EX (Proficy Scheduler): capacity, rescheduling, ERP, checked 16 Oct 2026
  14. ROB-EX (Proficy Scheduler): material availability, checked 16 Oct 2026
  15. Asprova: finite capacity, checked 16 Oct 2026
  16. Asprova: assembly operations and input items, checked 16 Oct 2026
  17. Asprova: PCB case study (component preparation), checked 16 Oct 2026
  18. Asprova: reschedule command, checked 16 Oct 2026
  19. Asprova: ERP interfaces, checked 16 Oct 2026
  20. Asprova: Visual Management delivery date quotations, checked 16 Oct 2026
  21. Asprova: package price, checked 16 Oct 2026
  22. Epicor Kinetic planning and scheduling: Kinetic APS, material planning, capable-to-promise, checked 16 Oct 2026
  23. Epicor Kinetic: Open REST API, checked 16 Oct 2026
  24. Odoo Manufacturing: finite capacity, checked 16 Oct 2026
  25. Odoo Manufacturing features: BOMs, routings, component availability, checked 16 Oct 2026
  26. Odoo Manufacturing: work order dependencies and automatic rescheduling, checked 16 Oct 2026
  27. Odoo: delivery lead times, checked 16 Oct 2026
  28. Odoo: pricing, external API, checked 16 Oct 2026
  29. MRPeasy: pricing, finite capacity, BOMs, integrations, checked 16 Oct 2026
  30. MRPeasy: production scheduling and materials, checked 16 Oct 2026
  31. MRPeasy: production schedule manual, checked 16 Oct 2026
  32. PlanetTogether: capacity, ERP integrations, checked 16 Oct 2026
  33. PlanetTogether: high-tech manufacturing (material arrival dates), checked 16 Oct 2026
  34. PlanetTogether: rescheduling tools, checked 16 Oct 2026
  35. PlanetTogether: APS product page (routings, new orders), checked 16 Oct 2026
  36. PlanetTogether: pricing, checked 16 Oct 2026
  37. INFORM FELIOS: APS, materials, SAP add-on, checked 16 Oct 2026
  38. INFORM FELIOS: project and assembly planning, checked 16 Oct 2026

Change log

  • First verification. Finite capacity, assembly dependencies, component availability, rescheduling, ERP integration, capable-to-promise and prices checked for eleven vendors.