Best Production Scheduling Software for Beverage Manufacturers 2026

✓ Verified 16 Oct 202611 products7 published criteriaNext check Jan 2027
Short answer. As of October 2026, SkyPlanner APS ranks #1 for beverage manufacturers with 80 of 100, because it books every fermentation and maturation tank for the full time a batch holds it and sequences each filling line by format and flavor with changeover times set in each direction. ROB-EX (Proficy Scheduler) ranks #2 with 75, because it builds batch orders from recipes, splits them to fit tank sizes and adds clean-in-place jobs automatically.

This list is for

  • Breweries and craft brewers scheduling brewhouse, fermentation and maturation tanks, and packaging lines
  • Soft drink, water and energy drink producers running filling lines with many flavors and pack formats
  • Juice and dairy-based drink plants where cleaning between products sets the sequence
  • Distilleries, cider makers and wineries with long tank holding times before bottling
  • Contract bottlers and canners filling for several brand owners
  • Beverage groups of any size, from one plant to several breweries or bottling plants scheduled together

This list is not for

#1 BEVERAGE MANUFACTURERS
1RANK
SkyPlanner APS APSPublic pricing
★★★★☆4.0/ 5 on this list
Manufacturers of any size that want finite capacity scheduling with automatic rescheduling on top of their ERP
PriceFrom €199/mo 5 workstations included, then €20/mo per extra workstation
Free trial30 days trial, no card
Finite capacityYes
Finite capacity scheduling depth5.0Allergen, cleaning and changeover sequencing4.0Recipe and batch sizing4.0Multi-stage flow with WIP buffers4.0Lot traceability and shelf-life constraints0.0Automatic rescheduling5.0ERP integration path5.0

Ranked here because: SkyPlanner APS ranks #1 with 80 and scores 5 of 5 on finite capacity, automatic rescheduling and ERP integration. Its beverage page describes one finite-capacity schedule from mash to pallet: fermentation and maturation tanks are workstations booked for the full time a batch holds them, so no tank is booked twice and no fill lands on a blocked or unstaffed line (4 of 5 on multi-stage flow). Each filling line has its own changeover matrix set in each direction, so pale to dark is a quick rinse and dark to pale a full clean, and the AI groups similar fills to cut total changeover time while meeting due dates (4 of 5). A fill starts only when its cans, bottles, labels and closures will be there. Autopilot reschedules on its own with the Arcturus engine, and it connects to any ERP or MES through a two-way REST API with webhooks and CSV import; the beverage page names SAP S/4HANA, Business Central, NetSuite, Ekos and OrchestratedBEER among the systems. As of October 2026 the price starts from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card for up to 20 workstations. Pick it if you brew, blend or fill to orders at any size and want tanks and lines in one plan that replans itself.

Not a fit if: You need a free-forever plan.

2RANK
ROB-EX Scheduler APSQuote only
★★★★☆3.8/ 5
Small manufacturers that want constraint-based scheduling with what-if scenarios
PriceQuote no public price
Free trialNone demo only
Finite capacityYes
Finite capacity scheduling depth4.0Allergen, cleaning and changeover sequencing4.0Recipe and batch sizing5.0Multi-stage flow with WIP buffers4.0Lot traceability and shelf-life constraints3.0Automatic rescheduling3.0ERP integration path2.0

Ranked here because: ROB-EX (Proficy Scheduler) ranks #2 with 75 and is the only 5 of 5 for recipe and batch sizing here: it creates multilevel batch orders from recipes and splits orders to fit tank and bin sizes. It adds clean-in-place jobs automatically from equipment rules (4 of 5), models intermediate tanks with minimum and maximum stock and transfer times between them (4 of 5), and warns when an intermediate's shelf life runs past its limit. Pick it if you run a batch process with intermediate tanks and want recipe-driven batch splitting in the scheduler.

Not a fit if: You want a public price, a self-service trial or a named ERP connector; as of October 2026 Proficy Scheduler publishes none of the three and offers demos instead.

3RANK
PlanetTogether APSQuote only
★★★★☆3.6/ 5
Manufacturers that buy through a sales-led demo and need named integrations with SAP, NetSuite or Kinaxis Maestro
PriceQuote no public price
Free trialNone demo only
Finite capacityNot stated
Finite capacity scheduling depth3.0Allergen, cleaning and changeover sequencing5.0Recipe and batch sizing3.0Multi-stage flow with WIP buffers4.0Lot traceability and shelf-life constraints4.0Automatic rescheduling1.0ERP integration path4.0

Ranked here because: PlanetTogether ranks #3 with 71 and is the only 5 of 5 for allergen, cleaning and changeover sequencing: its sequence-dependent setup logic groups products with shared allergens to cut full washdowns. It treats expiration as a scheduling constraint (4 of 5), maintains buffers at key points in multi-stage processes (4 of 5) and names integrations with SAP, NetSuite, Kinaxis Maestro, AVEVA and Aptean Ross. Pick it if allergen-driven washdowns decide your filling sequence and a planner will drive every replan.

Not a fit if: A late tank or a line stoppage should replan the schedule without a planner; PlanetTogether states only alerts and rescheduling tools (1 of 5), offers a demo and no trial, and publishes no price as of October 2026.

4RANK
Asprova APSQuote only
★★★☆☆3.1/ 5
Enterprise multi-plant manufacturers that need finite capacity scheduling with documented ERP interfaces
PriceQuote no public price
Free trialFree trial download after free Asprova ID registration; length not stated
Finite capacityYes
Finite capacity scheduling depth4.0Allergen, cleaning and changeover sequencing3.0Recipe and batch sizing3.0Multi-stage flow with WIP buffers4.0Lot traceability and shelf-life constraints2.0Automatic rescheduling1.0ERP integration path3.0

Ranked here because: Asprova ranks #4 with 61. Its drink-maker case study models setup times per item switch, tank cleanup when the raw material changes and tank capacity with upper and lower limits (3 of 5 on both cleaning and batch sizing). Time constraints between processes and pegging between operations give it 4 of 5 on multi-stage flow. Pick it if you plan long horizons for a large drinks plant with an in-house planner.

Not a fit if: You need automatic rescheduling or a public price; Asprova documents rescheduling as a manual command, and its package price is an open price as of October 2026.

5RANK
DELMIA Ortems APSQuote only
★★★☆☆3.0/ 5
Process and batch manufacturers that need finite capacity across machines, materials and labor
PriceQuote no public price
Free trialNone no trial stated
Finite capacityYes
Finite capacity scheduling depth5.0Allergen, cleaning and changeover sequencing2.0Recipe and batch sizing0.0Multi-stage flow with WIP buffers4.0Lot traceability and shelf-life constraints3.0Automatic rescheduling4.0ERP integration path3.0

Ranked here because: DELMIA Ortems ranks #5 with 60 and scores 5 of 5 on finite capacity across machine, material and labor limits. It reduces WIP and buffer inventory through multi-level bill of materials synchronization (4 of 5), handles shelf life as a hard or soft constraint with color alerts, and reschedules fast after disruptions (4 of 5). Pick it if you run a multi-level flow from concentrate or base to packed product on SAP or Sage X3.

Not a fit if: Recipe-based batch sizing or flavor cleaning rules decide your schedule; Ortems publishes no recipe or batch sizing model (0 of 5) and describes format changeover reduction without cleaning rules (2 of 5), and no price is published as of October 2026.

6RANK
Siemens Opcenter APS APSQuote only
★★★☆☆2.8/ 5
Enterprise manufacturers that need real-time rescheduling across several plants
PriceQuote no public price
Free trial30 days
Finite capacityYes
Finite capacity scheduling depth4.0Allergen, cleaning and changeover sequencing2.0Recipe and batch sizing1.0Multi-stage flow with WIP buffers3.0Lot traceability and shelf-life constraints3.0Automatic rescheduling4.0ERP integration path3.0

Ranked here because: Siemens Opcenter APS ranks #6 with 56. It schedules in finite or infinite capacity mode and adjusts the schedule dynamically in real time (4 of 5 on both). Its food sector flyer states that schedules prioritize short shelf-life products and flag shelf-life issues (3 of 5). Pick it if you run a large beverage operation with a dedicated planning team on Siemens software.

Not a fit if: You need recipe and batch sizing rules or cleaning sequences described for the filling line; Siemens describes neither (1 and 2 of 5), and publishes no price as of October 2026.

7RANK
Odoo Manufacturing Open sourcePublic pricing
★★★☆☆2.7/ 5
Small manufacturers that want finite capacity planning inside the Odoo ERP
Price€19.90/user/mo per user
Free trialFree tier One App Free: one app,…
Finite capacityYes
Finite capacity scheduling depth3.0Allergen, cleaning and changeover sequencing1.0Recipe and batch sizing3.0Multi-stage flow with WIP buffers3.0Lot traceability and shelf-life constraints4.0Automatic rescheduling3.0ERP integration path3.0

Ranked here because: Odoo Manufacturing ranks #7 with 54. It tracks lots with an upstream traceability report and stores expiration, best-before and removal dates per lot (4 of 5), maps recipes as bills of materials with by-products (3 of 5), and reschedules linked work orders automatically with the default "Auto-Reschedule (Keep Buffer)" setting. As of October 2026 its Standard plan costs 19.90 euros per user per month billed yearly, a first-year discount. Pick it if you want a low-cost ERP for a small brewery or drinks plant and changeovers take about the same time whatever ran before.

Not a fit if: Flavor or color order decides the cleaning time; Odoo applies a fixed cleanup time after each work order per work center (1 of 5).

8RANK
Kinaxis Planning platformQuote only
★★☆☆☆2.3/ 5
Multi-plant enterprises that want production scheduling inside a supply chain planning platform
PriceQuote no public price
Free trialNone no trial stated
Finite capacityNot stated
Finite capacity scheduling depth3.0Allergen, cleaning and changeover sequencing2.0Recipe and batch sizing1.0Multi-stage flow with WIP buffers1.0Lot traceability and shelf-life constraints3.0Automatic rescheduling4.0ERP integration path3.0

Ranked here because: Kinaxis ranks #8 with 46. Automated workflows re-optimize the plan on change (4 of 5), and it respects region- and customer-specific shelf-life constraints (3 of 5). Kinaxis says the majority of its customers run SAP ERP. Pick it if you are a multinational drinks group that needs supply chain planning first and plant scheduling second.

Not a fit if: You need tank holding times, recipe batch sizing or flavor sequencing modelled on the plant floor; Kinaxis describes none of them for its production scheduling application (1 of 5 on multi-stage flow).

9RANK
Fishbowl MRP-ERPPublic pricing
★★☆☆☆2.2/ 5
Small to midsize businesses that keep accounting in QuickBooks or Xero and want inventory and manufacturing in one tool
Price$229/mo entry plan
Free trialNone demo only
Finite capacityYes
Finite capacity scheduling depth3.0Allergen, cleaning and changeover sequencing0.0Recipe and batch sizing2.0Multi-stage flow with WIP buffers2.0Lot traceability and shelf-life constraints4.0Automatic rescheduling4.0ERP integration path2.0

Ranked here because: Fishbowl ranks #9 with 44. It tracks lots, serials and expiry dates with one-click recall reports (4 of 5), states finite-capacity planning, and its AI rebalances work centers, reroutes jobs and updates promise dates (4 of 5 on rescheduling). As of October 2026 its Essentials plan is listed at 229 US dollars per month, billed annually. Pick it if you are a small producer on QuickBooks or Xero and recall readiness matters more than tank scheduling.

Not a fit if: You need cleaning or flavor sequencing, or timed stages between brewhouse, tanks and filling; Fishbowl publishes no cleaning sequencing (0 of 5) and no timing between stages (2 of 5).

10RANK
MRPeasy MRP-ERPPublic pricing
★★☆☆☆2.1/ 5
Small manufacturers that want MRP, inventory and accounting connections in one cloud tool
Price$49/user/mo per user
Free trial15+15 days trial, no card
Finite capacityYes
Finite capacity scheduling depth3.0Allergen, cleaning and changeover sequencing0.0Recipe and batch sizing2.0Multi-stage flow with WIP buffers3.0Lot traceability and shelf-life constraints3.0Automatic rescheduling2.0ERP integration path2.0

Ranked here because: MRPeasy ranks #10 with 41. It tracks inventory by lot or batch with serial numbers and barcodes (3 of 5), and its pricing page lists finite capacity operations scheduling (MRP II) and overlapping, diverging and converging operations (3 of 5 on multi-stage flow). As of October 2026 prices start at 49 US dollars per user per month. Pick it if you are a small drinks maker that wants inventory, purchasing and scheduling in one low-cost tool.

Not a fit if: Cleaning between flavors sets your filling sequence; MRPeasy publishes no allergen, cleaning or changeover sequencing (0 of 5).

11RANK
Katana MRP-ERPPublic pricing
★★☆☆☆1.6/ 5
Growing multi-channel product businesses that sell through stores such as Shopify
PriceFree free plan
Free trial15 days
Finite capacityNot stated
Finite capacity scheduling depth1.0Allergen, cleaning and changeover sequencing0.0Recipe and batch sizing2.0Multi-stage flow with WIP buffers1.0Lot traceability and shelf-life constraints4.0Automatic rescheduling3.0ERP integration path2.0

Ranked here because: Katana ranks #11 with 31. It tracks lots, serial numbers and expiry dates from supplier to customer (4 of 5) and supports batch and process production with BOMs. Pick it if you run a small craft brewery or distillery that sells through Shopify or Amazon and needs batch tracking more than a finite schedule.

Not a fit if: You need finite capacity scheduling of tanks and lines; Katana derives capacity from weekly throughput over five weekdays (1 of 5) and publishes no cleaning sequencing (0 of 5).

All 11 products compared

#ProductCategoryEntry priceFree trialFinite capacityAuto rescheduleERP pathScore
1SkyPlanner APSAPSFrom €199/mo30 days, no cardYesAutopilotREST API (both directions), webhooks, CSV import; connects to any ERP or MES; customer projects have connected SAP, Microsoft Dynamics 365, Odoo, Epicor, Sage and Siemens80
2ROB-EX SchedulerAPSQuoteNoneYesReal-time rescheduling and what-if scenarios; trigger not describedERP and MES connectors (generic)75
3PlanetTogetherAPSQuoteNoneNot statednot stated (alerts and rescheduling tools)SAP, NetSuite, Kinaxis Maestro, AVEVA, Aptean Ross ERP; also John Galt, Shiftboard71
4AsprovaAPSQuoteFree trial download after free Asprova ID registration; length not statedYesnot describedSAP, QAD, JD Edwards, Dynamics AX61
5DELMIA OrtemsAPSQuoteNoneYesfast rescheduling after disruptions; trigger not describedGeneric ERP connectors; SAP adapter, Sage X3 connector60
6Siemens Opcenter APSAPSQuote30 daysYesDynamic schedule adjustment in real timeERP, MES (generic)56
7Odoo ManufacturingOpen source€19.90/user/moFree tierYesDependent work orders reschedule when a planner moves one in the GanttNative ERP; external API on the Custom plan only54
8KinaxisPlanning platformQuoteNoneNot statedyes (automated workflows re-optimize on change, Maestro platform)SAP46
9FishbowlMRP-ERP$229/moNoneYesConstraint-aware rescheduling; AI rebalances work centers, reroutes jobs and updates promise dates (home page)QuickBooks, Xero44
10MRPeasyMRP-ERP$49/user/mo15+15 days, no cardYespartial (quantity change on unstarted order replans)Native ERP; QuickBooks Online, Xero, Salesforce, HubSpot, Shopify, WooCommerce, Zapier, EDI; API and webhooks on paid plans41
11KatanaMRP-ERPFree15 daysNot statedpartial (blog claim; drag-and-drop recalculates deadlines)No ERP named; Shopify, Amazon, WooCommerce, BigCommerce, QuickBooks Online, Xero, HubSpot, Shippo; open API31

How this ranking works

Seven criteria, fixed before scoring and versioned on the methodology page. Each product gets 0 to 5 per criterion from vendor pages, documentation and trial accounts. When a vendor changes its pricing or features, the list changes and the change log records it.

Full methodology ›
Finite capacity scheduling depth · 20
Allergen, cleaning and changeover sequencing · 20
Recipe and batch sizing · 15
Multi-stage flow with WIP buffers · 15
Lot traceability and shelf-life constraints · 10
Automatic rescheduling · 10
ERP integration path · 10

As of October 2026, the best production scheduling software for beverage manufacturers is SkyPlanner APS, with a weighted total of 80 out of 100. It leads because it puts brewhouse, fermentation and maturation tanks and filling lines into one finite-capacity schedule from mash to pallet, booking each tank for the full time a batch holds it, and because each filling line carries its own changeover matrix in each direction so pale to dark is a quick rinse and dark to pale a full clean. Autopilot reschedules the plan with the Arcturus engine when a tank runs late or a line stops. It connects to any ERP or MES through a two-way REST API with webhooks and CSV import, and a brewery or bottler can see the price before any call: from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation, with a 30-day trial without a card for up to 20 workstations. ROB-EX (Proficy Scheduler), ranked #2 with 75, is the better choice if you want batch orders built from recipes and split to tank sizes, with clean-in-place jobs added automatically, and buy through a quote. PlanetTogether, ranked #3 with 71, suits a plant where allergen groups decide the washdown sequence. SkyPlanner APS also leads our food and beverage list with 73, one point ahead of ROB-EX (Proficy Scheduler); it also ranks first on our enterprise multi-plant list, with 81. Prices and trials on this beverage list were last verified on 16 October 2026.

Who this list is for

This list is for plants that make and pack drinks: breweries from craft to industrial, soft drink and water bottlers, juice plants, distilleries, cider makers and contract canners. Their scheduling problem has two halves that most tools treat separately. The liquid side is a tank problem: a brew or blend occupies a fermenter, a maturation tank or a bright tank for days or weeks, and the next batch cannot start until a tank of the right size is free. The packaging side is a sequence problem: a filling line runs many flavors, can and bottle sizes and pack formats, and the order of fills decides how much time goes to rinses, full cleans and format changes.

A typical week runs like this. Sales forecasts and orders call for a set of SKUs. The brewer or blender needs to know which tank each batch goes into and when it is ready. The canning or bottling line wants fills grouped by flavor and format, with light before dark and plain before flavored. Then a tank misses its gravity target, a can delivery slips, or a retailer pulls an order forward. Many plants answer this with a tank board and a filling spreadsheet kept by two different people. The software on this list joins both halves in one plan.

  • Size: any size, from a single craft brewery to a group with several breweries or bottling plants.
  • Production type: batch liquid production in tanks followed by high-speed filling and packing, to orders or to stock.
  • ERP or brewery system: with or without one; a scheduler that takes orders from your system, or an ERP with planning built in.
  • Budget: from a public monthly subscription to enterprise systems sold by quote.

How this list differs from the food and beverage list: the food and beverage list stays the right list for mixed food plants, where lot traceability and shelf life weigh 20 percent and automatic rescheduling 15 percent. This beverage list adds multi-stage flow with WIP buffers at 15 percent, because tank holding times between brewhouse and filling line decide drinks capacity, and gives lot traceability 10 percent, because a beverage plant usually keeps lot records in its ERP or brewery system.

How we ranked production scheduling software for beverage manufacturers

Seven criteria are weighted for beverage plants, fixed before any vendor was scored. Each score comes from vendor sites, documentation, case studies and pricing pages; a capability the vendor does not publish scores zero. The full rules are on the methodology page.

  • Finite capacity scheduling depth, 20 percent. Tanks, filling lines, crews and packaging materials are all limited, and a plan that ignores one of them double-books a fermenter or starts a fill without cans.
  • Allergen, cleaning and changeover sequencing, 20 percent. The time from one fill to the next depends on the pair: a rinse between similar flavors, a full clean from dark to pale or from a dairy or nut drink to a plain one. This criterion tests whether changeover and cleaning time depend on the sequence.
  • Recipe and batch sizing, 15 percent. A brew or blend must fit the tank it goes into, and orders must be grouped or split into batches that match tank and brewhouse sizes.
  • Multi-stage flow with WIP buffers, 15 percent. Liquid waits in fermentation, maturation and bright tanks before filling. The test is whether the scheduler holds each tank for the whole time and times the filling line against tank release.
  • Lot traceability and shelf-life constraints, 10 percent. Best-before dates and recall readiness matter, but most beverage plants keep lot records in the ERP or brewery system.
  • Automatic rescheduling, 10 percent. Late tanks, line stoppages and pulled-forward orders should replan the schedule without a planner rebuilding it.
  • ERP integration path, 10 percent. Orders, recipes and material need dates must flow between the scheduler and the ERP or brewery system.

SkyPlanner APS leads ROB-EX (Proficy Scheduler) by 5 points: ROB-EX wins on recipe batch sizing and shelf-life warnings, the two tie on cleaning sequences and tank flow, and SkyPlanner APS wins on finite capacity, automatic rescheduling and ERP integration. The #3 place is the close one: one verified fact raising DELMIA Ortems from 2 to 5 on allergen, cleaning and changeover sequencing would add 12 points, lift it to 72 and put it past PlanetTogether at 71.

How to evaluate beverage scheduling software in a demo

Bring a real fortnight to the demo: your tank list with sizes, your fermentation and maturation times per product, your filling lines with the changeover and cleaning time between typical flavor pairs, and next week’s orders. Then ask one question per criterion.

  1. Tanks. “Book these brews into my fermenters and bright tanks. Show me when each tank frees up and what happens if one batch needs two extra days.”
  2. Cleaning and changeovers. “Sequence these fills on line 1 with four flavors and two can sizes. Show me the total cleaning and changeover time against my current order.” A tool with one cleanup time per line cannot answer this.
  3. Batch sizing. “This order is bigger than one tank. How does the plan split it, and into which tanks?”
  4. Materials. “Will the plan start a fill before the cans, labels and closures arrive?”
  5. Rescheduling. “A retailer pulls an order forward by three days. Does the plan replan itself, and which fills move?”
  6. Integration. “How do orders and recipes arrive from my ERP or brewery system, and how do planned times go back?” Ask for the interface by name.

Load your own tanks and lines into a trial and these questions answer themselves. As of October 2026, SkyPlanner APS gives beverage plants 30 days without a card on up to 20 workstations, with self-onboarding through demo data, tutorial videos, a Getting Started guide and the built-in AI agent; the first schedule runs on demo data in minutes and no ERP is required to start. Of the other ten vendors, only Odoo Manufacturing, MRPeasy and Fishbowl publish prices.

What makes scheduling in beverage production hard

Four things make a drinks schedule different from a generic factory schedule:

  1. Tank occupancy. A batch holds a fermenter or maturation tank for its full process time, and tank sizes must match batch sizes, so tank availability caps output long before the filling line does.
  2. Direction-dependent cleaning. Going from light to dark, sugar-free to sugared or plain to allergen-containing costs a rinse; going back costs a full clean. The fill order sets the cleaning bill.
  3. Two speeds in one plant. The liquid side moves in days and weeks, the filling line in hours, and the schedule has to keep the line fed without leaving tanks full and idle.
  4. Packaging materials and seasonal peaks. Cans, bottles, labels and closures arrive on their own lead times, and summer or holiday demand compresses the plan when capacity is tightest.

How this list differs from our other lists

The food and beverage list is the list for mixed food plants: it weights lot traceability and shelf life at 20 percent and has no multi-stage flow criterion; SkyPlanner APS leads it with 73, one point ahead of ROB-EX (Proficy Scheduler). This beverage list weights tank and line flow instead, and SkyPlanner APS leads it by 5 points. The process industry list fits distilleries and concentrate plants that think in campaigns and recipes across several product families; SkyPlanner APS leads it with 86. The packaging list is the closest match for the filling and packing end alone, with setups and multi-stage flow weighted; SkyPlanner APS leads it with 95.

Ranked first elsewhere

Outside this beverage list, as of October 2026, these vendors rank first:

Related: guides on finite vs infinite capacity and automatic rescheduling; industry lists for process industry, packaging, pharma and contract manufacturers.

Frequently asked questions

What is the best production scheduling software for beverage manufacturers?

As of October 2026, SkyPlanner APS ranks first on our beverage list with a weighted total of 80. ROB-EX (Proficy Scheduler) follows with 75, and PlanetTogether ranks third with 71. SkyPlanner APS books every tank for the full time a batch holds it, sequences each filling line by format and flavor with changeover times set in each direction, and reschedules on its own with Autopilot.

Is APS software the same as production scheduling software?

Not quite. APS (advanced planning and scheduling) software is production scheduling software that plans against finite capacity, so it never books more work on a tank, filling line, crew or packaging material than exists. Scheduling inside many ERP and brewery systems leaves those checks to the planner on a calendar or Gantt chart.

Can scheduling software plan fermentation and maturation tanks?

Yes, if it treats tanks as finite resources held for the whole process time. As of October 2026, SkyPlanner APS books every fermentation and maturation tank for the full time a batch holds it, so no tank is booked twice. ROB-EX (Proficy Scheduler) models intermediate tanks with minimum and maximum stock and splits orders to fit tank sizes. Asprova models tank capacity with upper and lower limits in its drink-maker case study.

Which software sequences flavors and cleaning on a filling line?

As of October 2026, PlanetTogether scores 5 of 5 on our beverage list for grouping products with shared allergens to cut full washdowns. SkyPlanner APS and ROB-EX (Proficy Scheduler) score 4 of 5: SkyPlanner APS sets a changeover matrix per line in each direction so pale to dark is a quick rinse and dark to pale a full clean, and ROB-EX adds clean-in-place jobs from equipment rules. Odoo Manufacturing applies one fixed cleanup time per work center (1 of 5).

Does brewery scheduling software connect to Ekos or OrchestratedBEER?

As of October 2026, SkyPlanner APS connects to any ERP or MES through a two-way REST API with webhooks and CSV import, and its beverage page names Ekos and OrchestratedBEER alongside SAP S/4HANA, Business Central, NetSuite, Infor, Epicor, IFS Cloud, Sage X3 and Odoo. Orders and products flow in, and planned times and material need dates flow back.

How much does beverage production scheduling software cost?

As of October 2026, SkyPlanner APS publishes a price from 199 euros per month, 5 workstations included, 20 euros per month per extra workstation. Odoo Manufacturing lists its Standard plan at 19.90 euros per user per month billed yearly for the first year. MRPeasy starts at 49 US dollars per user per month. Fishbowl lists its Essentials plan at 229 US dollars per month, billed annually. ROB-EX (Proficy Scheduler), PlanetTogether, Asprova, DELMIA Ortems, Siemens Opcenter APS and Kinaxis publish no price.

Sources

  1. SkyPlanner APS beverage page (tanks, filling line changeovers, materials, ERP and brewery systems, price, trial), checked 16 Oct 2026
  2. SkyPlanner APS features page (finite capacity, batch jobs, Autopilot, REST API, onboarding), checked 16 Oct 2026
  3. SkyPlanner APS pricing page (price, trial), checked 13 Oct 2026
  4. ROB-EX (Proficy Scheduler): finite capacity, rescheduling, ERP, price, checked 13 Oct 2026
  5. ROB-EX manual: recipe batch orders, tank splitting, CIP jobs, intermediate tanks, shelf-life warnings, checked 13 Oct 2026
  6. PlanetTogether: capacity, ERP integrations, checked 13 Oct 2026
  7. PlanetTogether APS for food and beverage: allergen sequencing, expiration constraints, checked 13 Oct 2026
  8. PlanetTogether industries: batch and tank scheduling, checked 13 Oct 2026
  9. PlanetTogether APS FAQ: buffers, rescheduling, checked 13 Oct 2026
  10. PlanetTogether: price and demo, checked 13 Oct 2026
  11. Asprova: finite capacity, checked 13 Oct 2026
  12. Asprova drink manufacturer case study: setups, tank cleanup, tank capacity, checked 13 Oct 2026
  13. Asprova MS: time constraints between processes, inventory expiration date, checked 13 Oct 2026
  14. Asprova: reschedule command, checked 13 Oct 2026
  15. Asprova: ERP interfaces, checked 13 Oct 2026
  16. DELMIA Ortems: capacity, WIP, rescheduling, price, checked 13 Oct 2026
  17. DELMIA Ortems customer story Elidose: format changes, checked 13 Oct 2026
  18. DELMIA planning optimization: shelf-life constraint, checked 13 Oct 2026
  19. DELMIA Ortems: SAP adapter, checked 13 Oct 2026
  20. Siemens Opcenter APS: finite capacity, rescheduling, checked 13 Oct 2026
  21. Siemens Opcenter APS food sector flyer: changeovers, shelf life, checked 13 Oct 2026
  22. Siemens Opcenter APS: batches, WIP, checked 13 Oct 2026
  23. Siemens Opcenter APS SMT edition: ERP integration, checked 13 Oct 2026
  24. Odoo Manufacturing: finite capacity, recipes and by-products, checked 13 Oct 2026
  25. Odoo documentation: work center cleanup time, checked 13 Oct 2026
  26. Odoo documentation: expiration dates and lot tracking, checked 13 Oct 2026
  27. Odoo documentation: work order dependencies and auto-reschedule, checked 13 Oct 2026
  28. Odoo pricing: Standard plan, external API, checked 13 Oct 2026
  29. Kinaxis Production Scheduling: capacity, plants and departments, checked 16 Oct 2026
  30. Kinaxis life sciences: shelf-life constraints, batch-based supply pooling, checked 13 Oct 2026
  31. Kinaxis blog: Reckitt changeovers, checked 13 Oct 2026
  32. Kinaxis platform: automated re-optimization, checked 13 Oct 2026
  33. Kinaxis and SAP, checked 13 Oct 2026
  34. Fishbowl: finite capacity, lot and expiry tracking, routings, rescheduling, integrations, checked 16 Oct 2026
  35. Fishbowl pricing: Essentials plan, checked 13 Oct 2026
  36. MRPeasy pricing: price, finite capacity, multi-stage operations, API, checked 13 Oct 2026
  37. MRPeasy home page: lot and batch tracking, checked 13 Oct 2026
  38. MRPeasy routings: batch equipment capacity, checked 13 Oct 2026
  39. MRPeasy user manual: production schedule, checked 13 Oct 2026
  40. Katana production scheduling: capacity, operation sequencing, checked 16 Oct 2026
  41. Katana manufacturing features: batch and process production, checked 13 Oct 2026
  42. Katana inventory tracking: lots and expiry, checked 13 Oct 2026
  43. Katana blog: automatic rescheduling, checked 13 Oct 2026
  44. Katana home page: integrations, checked 13 Oct 2026

Change log

  • First verification. Finite capacity, cleaning and changeover sequencing, recipe and batch sizing, multi-stage tank flow, lot traceability, rescheduling, ERP integration and prices checked for eleven vendors.